Similar Projects
Rt 8; Clayville to Rt 840, Oneida Co
Infrastructure
Design
$8,500,000 est. value
Sauquoit, NY 13456

Mohawk Valley Community College Pavement Repairs 2022
Infrastructure
Bidding
$3,841,000 est. value
Utica, NY

Marcy Nanocenter Paving And Striping Contract No. 1
Alteration
Post-Bid
Marcy, NY

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 City Wide Paving Contract 1 Mill and Fill
Results
Utica, NY

2021 Street Paving Program - Contract - 3
Results
Utica, NY

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Cold Miling and Resurfacing Project
Alteration
Results
NY

2022 Paving Contract #1 - Mill & Fill
Infrastructure
Post-Bid
Utica, NY

Mohawk River Trail Rest Area
Alteration
Results
NY

Type 3, Modified Binder Asphalt Concrete, Bituminous Paving
Infrastructure
Post-Bid
Lee Center, NY

On Demand Repairs to Thruway Infrastructure
Infrastructure
Results

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Replacement of Worn or Missing Pavement Markings
Infrastructure
Results
$2,900,000 est. value

CR-19 Road Improvement Project
Infrastructure
Post-Bid
$4,000,000 est. value
Westmoreland, NY 13490

Last Updated 06/17/2022 12:09 AM
Project Title

701 Lawrence Street Remediation of Contaminated Soil

Physical Address View project details and contacts
City, State (County) Rome, NY 13440   (Oneida County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Placement and compaction of a 2-foot soil cover at 701 Lawrence Street in the City of Rome, New York. The surface elevations of the cover system have been designed to allow for storm water drainage off the cover, with no low spots for water to collect. The contractor will be required to grade the current site to generate a soil surface that is roughly two feet below the elevation of the proposal final cover elevation. Generally, the site boundary will slope from the northeast to the southwest where an existing 18" culvert is located to the south of the pavement on Lawrence Street. This culvert drains the site storm water across the bike path and into the canal. The balance of cut and fill (approximately 450 cubic yards) from the site will promote drainage to this area. This will allow for the twofoot cover to be placed uniformly across the site.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents