Similar Projects
East Capitol Residential
New Construction
Design
$480,000 est. value
Salt Lake City, UT 84103

LHM Jordan Commons
New Construction
Design
Sandy, UT

DFCM Construction VBS Commissioning - UU Huntsman Mental Health Institute
Term Contract
Sub-Bidding
Salt Lake City, UT 84108

Residential Treatment
Term Contract
Sub-Bidding
Salt Lake City, UT 84111

On-Call Task Order Striping/Painting And Other Miscellaneous Construction
Term Contract
Post-Bid
Salt Lake City, UT

SLCo Window Washing
Term Contract
Post-Bid
Salt Lake City, UT

Portable or Mobile Toilets
Results
Salt Lake City, UT

S201--660 (S) Exterior Window Cleaning Service
Results
Salt Lake City, UT 84148

27th Street Collective
New Construction - 12,800 SF
Construction
$1,600,000 est. value
Salt Lake City, UT 84106

Erin Hills Estates
New Construction
Construction
West Valley City, UT 84128

Hamlet Development
New Construction
Pending Verification
Murray, UT 84123

Jordan Woods
New Construction
Pending Verification
South Jordan, UT 84095

Daybreak Village 9 Plat 2
New Construction
Design
South Jordan, UT 84009

Blinker / Rectangular Rapid Flashing Beacons (RRFB) Sign Maintenance
Term Contract
Sub-Bidding
Salt Lake City, UT 84111

Window Cleaning AVL
Alteration
Post-Bid
Salt Lake City, UT

Last Updated 07/29/2022 02:08 PM
Project Title

2022 Healthy Homes Radon Gas Mitigation Contractor Pool

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84111   (Salt Lake County)
Category(s) Residential, Single Trades
Sub-Category(s) Service/Term Contracts, Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

RFQ purpose: Create a contractor pool with multiple qualified radon gas mitigation contractors who will bid on radon gas mitigation projects as part of the Healthy Homes Production Grant. Expected number of projects: The Healthy Homes Production Grant will work on approximately 130 homes ("projects") between September 1, 2022, and December 31, 2025. Projects with radon gas at or above 4 picocuries will have a radon gas mitigation system installed. o Historically, 25% of Healthy Homes projects have required radon gas mitigation systems. o Acceptance into the contractor pool through this RFQ allows you to bid on projects. o Note that individual radon mitigation projects will be awarded to the contractor with the lowest bid. For more information or to receive the information session recording, please contact Randy Jepperson by phone (385-468-4886) or email (rjepperson@slco.org).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents