Project Title | SOF OWLS Creek Boat Maintenance Facility, Naval Air Station Oceana, Virginia Beach, Virginia |
Physical Address | View project details and contacts |
City, State (County) | Virginia Beach, VA 23460 (Virginia Beach City County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Military Facility, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes Construction of a Pre-Engineered Metal Building (PEMB) approximately 5,300 SF forboat maintenance operations. The building superstructure will consist of structural steel framing withinsulated metal exterior wall panels and roof panels. Interior partition walls will consist of non-load baring concrete masonry unit or light gauge metal framing construction. The building will havemaintenance bays, elec/mech/security rack space, storage racks for MRVs, and a gear storage cage. Asmall work area and unisex restroom are Options and incidental related work. ONLY CONTRACTORS IN MACC GROUP ID: ML-C00075 CAN BID ON THIS PROJECT. NAVFAC Solicitation No.: N40085-23-R-2851 NAVFAC Specification Work Order Nos.: 1707671 (Attachment A) NAVFAC Drawing Nos.: Reference Drawings (102 pages) (Attachment I) Title: SOF Owls Creek Boat Maintenance Facility Location of the work: Naval Air Station Oceana, Virginia Beach, VA Description of the work: The work includes Construction of a Pre-Engineered Metal Building (PEMB) approximately 5,300 SF forboat maintenance operations. The building superstructure will consist of structural steel framing withinsulated metal exterior wall panels and roof panels. Interior partition walls will consist of non-load baring concrete masonry unit or light gauge metal framing construction. The building will have maintenance bays, elec/mech/security rack space, storage racks for MRVs, and a gear storage cage. A small work area and unisex restroom are Options and incidental related work. Please see drawings and specifications for further details. Estimated Budget Amount or Price Range: In accordance with FAR 36.204 Disclosure of the Magnitude of Construction Projects, the estimated price range for this project is between $1,000,000 and $5,000,000. NAICS Code: 236220 - Commercial and Institutional Building Construction Time for completion: Contract completion date is 532 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed. Wage Rate Requirements: Department of Labor (DoL) General Decision Number: VA20230167 dated 01/13/2023 (Attachment B) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination may be issued via amendment. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $661.93 for each calendar day of delay until the work is completed or accepted. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for Construction Alternate I (Apr 1984) record shop drawings and reproducible copies of these record drawings are required. Pre-Propsal Inquiries (PPIs): PPIs must be submitted in writing on the attached Pre-Proposal Inquiry Form (ATTACHMENT F) to Keith Logan at keith.o.logan.civ@us.navy.mil no later than 24 August 2023 at 14:00 PM EDT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||
Details | 5,300 SF.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |