Similar Projects
Upton Elementary / Middle School boiler Heating Hot Water System Replacement Project
Renovation
Sub-Bidding
$300,000 CJ est. value
Upton, WY 82730

Moyer Building Medium Density Fibreboard (MDF) Cooling Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Powell, WY 82435

Heating Upgrades
Alteration
Post-Bid
Jackson, WY 83001

Coroners Office HVAC Upgrades
Alteration
Post-Bid
Jackson, WY 83001

Story Elementary HVAC Upgrade
Alteration
Results
$100,000 est. value
Story, WY 82832

Purchase and Installation of Boiler for County Courthouse Snowmelt System
Renovation
Results
$117,343 CJ est. value
Laramie, WY 82070

Chiller Removal and Replacement
Renovation
Sub-Bidding
$80,000 CJ est. value
Cheyenne, WY 82001

H941--Airflow Test and Balance (Tab) and HVAC Controller Services
Term Contract
Post-Bid
Loveland, CO - Cheyenne, WY 82001

Rocky Mountain High School Ventilation Improvement
Renovation
Results
$419,914 CJ est. value
Cowley, WY 82420

Waste Water Collections Building HVAC Upgrades
Renovation
Sub-Bidding
$460,000 CJ est. value
Casper, WY 82609

Replace the Pneumatic HVAC controls
Alteration
Post-Bid
Cody, WY 82414

Sheridan College Whitney Center for the Arts IT Core ACU-2 Replacement
Renovation
Results
$245,735 CJ est. value
Sheridan, WY 82801

Chiller Removal and Replacement
Renovation
Sub-Bidding
$80,000 CJ est. value
Cheyenne, WY 82009

Cooling Upgrades
Term Contract
Post-Bid
Casper, WY 82601

Old Library HVAC Upgrades
Renovation
Sub-Bidding
$70,000 CJ est. value
Jackson, WY 83001

Last Updated 03/15/2023 03:35 AM
Project Title

Boiler Replacements at Various Sites

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Mechanical Systems Deming Elementary School: replacement of two converted Kaewanee boilers with low pressure steam boilers and associated housekeeping pads, associated ducting, electrical connections and disconnects, duplex condensate receiver tank, isolation valves, piping and pipe insulation, replacement of domestic watermain service entry. Venting may need to be modified based upon new boiler requirements and include replacement of domestic 40-gallon water heater. Boilers are to be monitored and controlled via "Automated Logic" or "Johnson Controls". Bain Elementary School: replacement of two atmospheric boilers, associated piping housekeeping pads, ducting, electrical connections and disconnects, piping and pipe insulation, and isolation valves for servicing. To include any other components that are needed to maintain an efficient performing system. Assess all existing system components for viability for reuse or need. Work to also include coordinating the interface of the boiler connections with the existing control systems for the building, "Automated Logic" Site Directions: Bain Elementary 903 Adams Avenue Cheyenne, Wyoming 82001 Deming Elementary 715 West Fifth Avenue Cheyenne, Wyoming 82001

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents