Similar Projects
Commercial Boiler/Chiller/HVAC/Refrigeration Repair and Preventative Maintenance (On-Call)
Alteration
Bidding
Lexington, SC

Philip Street Building Automation System (BAS) and HVAC(VAV/FP) Replacement Project
Post-Bid
Charleston, SC 29401

Refrigerated Walk-In Cooler
Post-Bid
Moncks Corner, SC 29461

Paint Existing Plant Equipment and Piping at Lower Wastewater Treatment Plant
Results
North Charleston, SC

Detention Service and Equipment Upgrades - Allendale CI - Replace Kitchen Boiler
Results
$137,600 to $172,000 est. value
Fairfax, SC 29827

J045--Boiler Life Expectancy and Damage Assessment Inspection
Post-Bid
Columbia, SC 29209

Intellihot Water Heaters
Results
Columbia, SC

Autoclave And Boiler Maintenance - Hollings Marine Laboratory
Post-Bid
Charleston, SC 29412

Ozone Contact Chamber Rehabilitation Services
Results
Conway, SC

TOC-Mechanical Contracting Services
Alteration
Post-Bid
Charleston, SC

Replace Boiler in TTC Bldg. 510
Results
North Charleston, SC

TOC - Mechanical Contracting
Alteration
Post-Bid
Less than $4,000,000 est. value
Greenville, SC

Steam Fired Domestic Water Heater
Results
Columbia, SC

R22-30 Refrigerant
Alteration
Post-Bid
Columbia, SC

UOFSC FY21-1206 Flora-1st Floor Mechanical UPFIT
Results
$300,000 to $400,000 est. value
Columbia, SC 29201

Last Updated 04/18/2022 10:19 AM
Project Title

Chiller Acquisition

Physical Address View project details and contacts
City, State (County) Inman, SC 29349   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes replacement of chillers at two (2) schools: Oakland Elementary School and Boiling Springs Middle School. Boiling Springs Middle School – Direct replacement/startup of an existing 400 ton air cooled chiller, Oakland Elementary School – Direct replacement/startup of an existing 50 ton air cooled chiller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Schedules for HVAC, Schedules for Central Cooling Equipment, Packaged Water Chiller Schedule.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents