Similar Projects
Marine Science Center ADA Enhancements
Bidding
Less than $65,000 est. value
Ponce Inlet, FL 32127

Fleming Avenue ADA Sidewalk
Bidding
Less than $70,500 est. value
De Land, FL 32720

New Smyrna Beach High School Campus Wide Elevated Walkway Repairs
Post-Bid
New Smyrna Beach, FL 32168

Thornby Park Boardwalk and Trail Improvements
Post-Bid
Less than $286,000 est. value
Deltona, FL

Concrete Driveway and Site Work for Lift Station #31 Project
Results
De Land, FL 32720

Sweetheart Trail - Beach St. Wilder Blvd. to Shady Place
Results
Daytona Beach, FL 32100

New Hampshire Avenue ADA Sidewalk
Post-Bid
Less than $127,000 est. value
De Land, FL 32720

Providence Boulevard Shared Use Trail
Results
Deltona, FL

Sunrise Park Boat Ramp Improvements
Results
Less than $1,094,325 est. value
Holly Hill, FL

Dr. Martin Luther King, Jr. Blvd. Roadway and Pedestrian Improvements Project
Results
$2,000,000 to $2,200,000 est. value
Daytona Beach, FL 32100

Design/Build Services for The East Central Regional Rail Trail, Phase 4A (Guise Road to Gobbler's Lodge Road, Osteen)
Results
Osteen, FL

30th Street ADA Sidewalk Project - Pine Tree Drive to Hibiscus Drive
Results
Less than $74,545 est. value
Edgewater, FL

Sweetheart Trail - Sickler Drive
Results
Daytona Beach, FL

Rob Sullivan CDBG / ADA Parking Stalls
Results
DeBary, FL 32713

CDBG Ames Parking Improvements and Landscape Renovations
Results
Ormond Beach, FL 32173

Last Updated 03/07/2019 07:32 AM
Project Title

Sidewalk Repair and Reconstruction Project

Physical Address View project details and contacts
City, State (County) DeBary, FL   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Each individual unit price for concrete work shall be all inclusive. This would include costs for mobilization, layout, saw cut and demolition of existing sidewalk/curb and any unsuitable sub-grade. Fill and compact new sub-grade where necessary. Unit price shall also include any and all haul-out disposal costs, and disposal fees. Construction of new sidewalks must conform to all ADA standards. Contractor is to patch back any disturbed asphalt, grass, or other area. Contractor may remove tree roots within City right-of-way as needed. Contractor to include all MOT and stormwater protection devices necessary during demolition and construction as necessary. Sidewalks are completed without engineer's design. Repair/replacement is coordinated in field with City personnel. For Location Details See Page 24 in Request for Proposal
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents