Similar Projects
Maple Hill
New Construction
Design
Franklin, MA 02038

Residences At Norfolk Station
New Construction - 11,630 SF
Design
Norfolk, MA 02056

RFQ Construction Management at Risk - Restoration and Renovation to the Historic Town Hall Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$16,000,000 CJ est. value
Cohasset, MA 02025

Tri-Town Regional Water Treatment Plant - General Bid
New Construction, Infrastructure
Bidding
$70,000,000 CJ est. value
Braintree, MA 02184

Asbestos Abatement and Building Demolition at the Old Primavera School
Term Contract, Demolition, Infrastructure
Sub-Bidding
$850,000 CJ est. value
Bellingham, MA 02019

Tri-Town Regional Water Treatment Plant - Sub Bid
New Construction, Infrastructure
Sub-Bidding
$70,000,000 CJ est. value
Braintree, MA 02184

Constructing One Infiltration Basin
Post-Bid
$93,160 est. value
Franklin, MA

Excavation for Identification of Water Services
Post-Bid
$1,230,142 est. value
Boston, MA

Selective Kitchen and Bath Upgrade Phase 4
Renovation
Results
$113,571 est. value
Cohasset, MA 02025

Excavation Work
Infrastructure
Results
$60,000 est. value
Boston, MA

Spring Street Solar
New Construction
Construction
Franklin, MA

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Balfour Senior Living Facility
New Construction
Pending Verification
Brookline, MA 02445

Residences at Quarry Hills
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Milton, MA 02186

Residence At Carter Mill
Renovation, Addition
Design
Needham, MA 02494

Last Updated 07/25/2022 01:05 PM
Project Title

Glen Brook Way Development Phase 2

Physical Address View project details and contacts
City, State (County) Medway, MA 02053   (Norfolk County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 25, 2022, this project has secured funding and is pending planning and zoning approvals. An architect has been selected. There is no current construction timeline.

Details

Apartments, 44 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents