Similar Projects
Last Updated | 08/19/2022 04:33 PM |
Project Title | Construction of New White House Intermediate School |
Physical Address | View project details and contacts |
City, State (County) | White House, TN 37188 (Robertson County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $27,912,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of this project includes, but is not limited to, the following: site work and new construction of an educational facility. As of July 21, 2022, a general contractor has been selected for this project. A firm construction timeline for this project has not yet been released. Terracon Project No. 18215118 5% Bidders Bond is required. Performance Bond and Payment Bond in the full amount of the bid will be required. All bidders must be licensed Contractors as required by the Contractors Licensing Act of 1976, as currently amended. A. All work to construct New White House Intermediate School located in Sumner County, Tennessee, as specified herein and shown on the accompanying drawings. The Work shall be constructed complete and ready for occupancy, except for the items specifically excluded in "Work Not In Contract". B. Incidental work Included (but not limited to) 1. Verification of correct location of electrical receptacles, telephone outlets, computer outlets, and similar outlets to suit furniture, equipment, and casework arrangement. 2. Verification of correct location of plumbing and HVAC services and waste lines to suit equipment and casework arrangement 3. Installation of conduit, outlet boxes with finished covers and terminal cabinets for telephone system. 4. Site improvement as indicated C. Earthwork (including but not limited to) 1. Clearing and Grubbing as necessary 2. Demolition of all existing improvements except where noted otherwise 3. Removing, adjusting, and/or salvaging existing utilities and improvements as required to complete project. 4. Excavate and stockpile topsoil and usable fill material 5. Compaction of underlying surface, Undercut as necessary 6. Locate and furnish any required borrow material 7. Replace topsoil as required 8. Construct and backfill storm sewer system. 9. Construct utilities a. Provide safe temporary closures on water line stubs to withstand water pressures if the line is pressurized 10. Construct curb and gutter. 11. Construct subgrade, base pavement, striping, and all components of pavement 12. Traffic control and barricades to maintain traffic during construction 13. Installation of erosion and sediment control measures including grassing 14. Miscellaneous other Work and incidental Work 15. Coordinate and perform any utility relocations due to conflicts |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |