Similar Projects
Large Machine Mowing
Infrastructure
Bidding
$800,000 est. value

Large Machine Mowing
Infrastructure
Bidding
$800,000 est. value

Highway Landscape on SR A1A
Post-Bid
Less than $471,000 est. value
FL

Highway Landscape on SR 13
Post-Bid
Less than $496,000 est. value
FL

Highway Landscape on SR 228
Results
Less than $1,111,000 est. value
FL

Tree Removal, Stump Grinding, and Debris Removal on an as Needed Basis
Results
Less than $80,000 est. value

Tree Planting Service
Post-Bid
Live Oak, FL 32060

Application of Selective Herbicide to Turf Grass Areas, Litter Removal and Large Machine Mowing on Primary Roadways in Lafayette and Taylor Counties
Results
Less than $51,000 est. value

O`Leno to Ichetucknee Trail Maintenance
Post-Bid
FL

Hazardous Tree Removal - Jacksonville FL
Results
Jacksonville, FL

Large Machine Mowing
Post-Bid
Less than $250,000 est. value

Highway Landscape on SR 100
Results
Less than $90,000 est. value
FL

Mowing Maintenance of Sidewalks, Guardrails, and Retention Areas to Include Urban Mowing and Open Areas
Post-Bid
FL

Highway Landscape on I-10
Results
Less than $274,000 est. value
FL

Roadside Mowing and Litter Removal
Post-Bid
FL

Last Updated 05/13/2021 05:15 AM
Project Title

Removal of Trees, Stumps, Debris and Tree Trimming

Physical Address View project details and contacts
City, State (County) (Baker, Columbia, Dixie, Duval, Gilchrist, Hamilton, Lafayette, Suwannee, Union Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract for Removal of Trees, Stumps, Debris and Tree Trimming on an as Needed Basis By the Department Within the Lake City Operations Area. Section 0001 Tree Trimming and Removal (Mh) E101- 72- Mobilization (Emergency Response) Ea 18.000 E580-332- 21 Tree Removal (4" to 12") Ea 292.000 E580-332- 22 Tree Removal (13" to 24") Ea 351.000 E580-332- 23 Tree Removal (25" to 36") Ea 75.000 E580-332- 24 Tree Removal (37" to 48") Ea 30.000 E580-332- 25 Tree Removal (> 48") Ea 10.000 E580-332- 97 Tree Trimming Ea 200.000 E580-334- 1 Stump Grinding (4" to 24") Ea 450.000 E580-334- 2 Stump Grinding (25" to 48") Ea 50.000 E580-334- 3 Stump Grinding (> 48") Ea 10.000

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents