Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

Jessamine Animal Care and Control Facility HVAC
Post-Bid
Nicholasville, KY 40356

School of Dentistry IAQ Upgrades
Alteration
Post-Bid
Louisville, KY 40202

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Cooling Tower Repair
Results
Louisville, KY 40202

HVAC Maintenance
Term Contract
Post-Bid
Bowling Green, KY 42104

Bi-Polar Ionization Units
Results
KY

Center for Predictive Medicine HVAC Controls Modifications
Alteration
Post-Bid
Louisville, KY

Jeffersontown Library Attic Furnaces Units
Results
Jeffersontown, KY 40299

HVAC Full Service Maintenance
Term Contract, Infrastructure
Post-Bid
Erlanger, KY

Three Rooftop HVAC Units
Results
Covington, KY 41017

HVAC Preventive Maintenance and Service
Term Contract
Post-Bid
KY

FRL HVAC Duct Replacement
Results
$25,000 est. value
Shelbiana, KY 41562

Caverna Independent Schools Secure Entrance Improvements
Alteration
Post-Bid
Less than $200,000 est. value
Cave City, KY 42127

Installation of Air Preheater at E.W. Brown Station
Results
$55,000 est. value
Harrodsburg, KY 40330

Last Updated 10/24/2022 05:32 PM
Project Title

Cooling Tower & Domestic Water System Replacement East Kentucky Veterans Center

Physical Address View project details and contacts
City, State (County) Hazard, KY 41701   (Perry County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $790,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project is for the removal of two existing evaporative coolers for heat pump hydronic system and the installation of two new units in a separate location allowing continuous operation without downtime. Existing coolers shall be removed after new units are operational. Plumbing improvements include installation of four new electric water heaters, panelboard and automatic transfer switch and circuits for emergency power. Two new potable hot water recirculation loops will be installed throughout the building and heat trace will be deactivated. Installation of a new emergency water distribution system with self-priming pump will deliver non-potable water to selected janitor mop sinks throughout the building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents