Similar Projects
Last Updated | 03/29/2021 12:24 PM |
Project Title | 2021 Tennis Court Reconstruction at Buffalo High School |
Physical Address | View project details and contacts |
City, State (County) | Buffalo, MN 55313 (Wright County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Contractor shall protect and utilize techniques to prevent damage to existing site facilities scheduled to remain. B. Install erosion control devices prior to the start of excavation. C. Salvage existing tennis nets and site signage. D. Remove existing fencing systems, bituminous pavement, concrete pavement, and tennis court equipment as shown on the Drawings. E. Excavate existing soils to the required depths and install new subdrainage system. F. Place and compact new imported granular fill and aggregate base. G. Install new fencing system, concrete maintenance strip, concrete slab, bituminous pavement, and court amenities as shown. H. Apply filler coats and color finish system over tennis court area and stripe eight doubles courts per USTA Specifications. I. Install salvaged signs, perform turf restoration, remove erosion control devices following final site stabilization, and restore all affected areas. |
||||||||
Details | Park/Playground, New Construction.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |