Similar Projects
Bde Maka Ska Park Pavilion
New Construction
Design
Minneapolis, MN 55408

Century High School and Mayo High School Tennis Court Reconstruction
Bidding
Rochester, MN 55906

Farmington High School Tennis Courts
Bidding
Farmington, MN 55024

Skatepark, Bike Park, Pump Track Solutions
Term Contract
Post-Bid
Less than $15,000,000 est. value

Skatepark, Bike Park, Pump Track Solutions
Term Contract
Post-Bid
Less than $15,000,000 est. value

Heritage Village Park Phase 3 Site Improvements
Results
Inver Grove Heights, MN 55076

Field Reconstruction ISD 11 High School Stadiums
Results
Anoka, MN 55303

Hillcrest Golf Course Redevelopment
New Construction
Pending Verification
Saint Paul, MN

Petsuites Of Woodbury
New Construction - 13,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Woodbury, MN

Barsness Park Single Track Trail
Bidding
Glenwood, MN 56334

Alpine Park Off Leash Area Expansion
Post-Bid
Anoka, MN

New Splash Pad at Phelps Field Park
Results
Minneapolis, MN 55407

Tower Park Improvement
Bidding
Lino Lakes, MN

Athletic Surfaces: Tracks and Courts
Term Contract
Post-Bid
MN

Hok-Si-La Park Recreation Trail
Results
$443,508 est. value
Lake City, MN

Last Updated 03/29/2021 12:24 PM
Project Title

2021 Tennis Court Reconstruction at Buffalo High School

Physical Address View project details and contacts
City, State (County) Buffalo, MN 55313   (Wright County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. Contractor shall protect and utilize techniques to prevent damage to existing site facilities scheduled to remain. B. Install erosion control devices prior to the start of excavation. C. Salvage existing tennis nets and site signage. D. Remove existing fencing systems, bituminous pavement, concrete pavement, and tennis court equipment as shown on the Drawings. E. Excavate existing soils to the required depths and install new subdrainage system. F. Place and compact new imported granular fill and aggregate base. G. Install new fencing system, concrete maintenance strip, concrete slab, bituminous pavement, and court amenities as shown. H. Apply filler coats and color finish system over tennis court area and stripe eight doubles courts per USTA Specifications. I. Install salvaged signs, perform turf restoration, remove erosion control devices following final site stabilization, and restore all affected areas.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents