Similar Projects
Azalia Solar Farm / Milan Township
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Dundee, MI 48131

Dunham Street Improvements
Infrastructure
Design
$1,767,953 CJ est. value
Dundee, MI 48131

Basketball Court Resurfacing and Repairs RFP
Infrastructure
Bidding
$66,725 CJ est. value
Monroe, MI 48161

Nature Park Sidewalk/Kayak Launch
Infrastructure
Bidding
$500,000 CJ est. value
Milan, MI 48160

Monroe Consolidated Drain Improvements
New Construction, Infrastructure
Post-Bid
$2,342,874 CJ est. value
Monroe, MI 48161

Sterling State Park - Fishing Pier
Infrastructure
Post-Bid
$500,000 CJ est. value
Monroe, MI 48162

Sterling State Park - Heritage Trail Improvements
Infrastructure
Results
$2,401,502 CJ est. value
Monroe, MI 48162

USDA Wastewater System Improvement
Infrastructure
Results
$8,402,269 CJ est. value
Carleton, MI 48117

Water Treatment Plant Motor And Drive Replacement
Renovation
Construction
$420,000 CJ est. value
Monroe, MI 48161

ProMedica Monroe Regional Hospital / Frenchtown Charter Township
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Monroe, MI 48162

2023 Bond - Airport Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$64,240,000 CJ est. value
Carleton, MI 48117

Whitman Drive Special Assessment District
Infrastructure
Bidding
$95,000 CJ est. value
Monroe, MI 48161

RFQ Contractor - Monroe Harbor Advanced Maintenance Dredging
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Monroe, MI 48161

Father Cairns Park Improvements
Infrastructure, Renovation
Results
$2,650,369 CJ est. value
Monroe, MI 48162

Hot Mix Asphalt Widening and Resurfacing, Aggregate Shoulders and Pavement Markings
Infrastructure
Bidding
$2,149,000 CJ est. value
Erie, MI 48133

Last Updated 05/11/2023 03:27 PM
Project Title

Water Treatment Plant Filter Building and Fluoride Containment Roof Replacements

Physical Address View project details and contacts
City, State (County) Monroe, MI 48161   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $36,604 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City Clerk of Monroe, Michigan will receive electronic proposals for Monroe Water Treatment Plant Filter Building & Fluoride Containment Roof Replacements. Bids will be held for at least 30 days. recommend an award at the Monroe City Council meeting on May 15, 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents