Similar Projects
Windermere Ward Trail - Town of Windermere
Infrastructure
Conception
Less than $2,590,000 est. value
Windermere, FL

Reams Road Widening Project - Orange County
Infrastructure, Alteration
Conception
$39,300,000 est. value
FL

Orange Technical College Winter Park Campus Replacement Project
New Construction, Renovation, Infrastructure
Design
$40,000,000 CJ est. value
Winter Park, FL 32789

Guard Booth
New Construction, Infrastructure
Design
$270,000 CJ est. value
Orlando, FL 32801

RFP D/B - I-4 (SR 400) at Sand Lake Road Interchange from West of SR 528 to West of SR 435 & I-4 (SR 400) from West of Central Florida Parkway to West of SR 528
Infrastructure
Bidding
$193,990,083 CJ est. value
Orlando, FL 32829

Orange County Utilities Site Restoration
Infrastructure
Bidding
$4,100,000 CJ est. value
Orlando, FL 32801

The Grand
New Construction, Infrastructure
Sub-Bidding
$60,000,000 CJ est. value
Orlando, FL 32819

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Christian Brothers Automotive / Ocoee - Rebid
New Construction, Infrastructure - 4,561 SF
Post-Bid
$1,200,000 CJ est. value
Ocoee, FL 34761

SR 417 Bridge over SR 528 Preservation
Results
Orlando, FL 32800

Orange County Utilities Site Restoration
Infrastructure
Results
Less than $3,000,000 est. value
Orlando, FL

Sport Subaru - District West - Site Development
New Construction
Construction
Orlando, FL 32804

Nextran Orlando
New Construction - 86,811 SF
Construction
$18,000,000 est. value
Orlando, FL 32809

Gem Groves
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Winter Garden, FL 34787

Environmental Products Group New Warehouse
New Construction, Infrastructure - 41,952 SF
Pending Verification
$5,000,000 CJ est. value
Apopka, FL 32703

Last Updated 08/31/2022 10:39 AM
Project Title

Orange County Convention Center Pedestrian Bridge Repairs

Physical Address View project details and contacts
City, State (County) Orlando, FL 32819   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,130,690 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Orange County Convention Center Pedestrian Bridge Repairs . Question Submission Deadline:July 12, 2022, 5:00pm

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents