Similar Projects
Last Updated | 01/09/2019 04:22 AM |
Project Title | CMRB; SW; FDP; Mill; Level; Intermediate; Surface; Loops; GR |
Physical Address | View project details and contacts |
City, State (County) | SC (Spartanburg County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal Of Exist. Guardrail 50.000 Lf Unclassified Excavation 30.000 Cy Borrow Excavation 1,678.000 Cy Excavation For Shoulder Paving 125.000 Sta Hauling Of Excavated Shoulder Material 125.000 Sta Cement Modified Recycled Base (12" Unif)-Curing Method b 108,446.000 Sy Portland Cement For Cement Modified Recycled Base Course 5,204.000 Ton Maintenance Stone 628.600 Ton Hma Shoulder Widening Course 830.720 Ton Liquid Asphalt Binder Pg64-22 1,829.189 Ton Full Depth Asph. Pav. Patching 8" Unif 37,360.000 Sy Milling Existing Asphalt Pavement 2.0" 149,331.000 Sy Milling Existing Asphalt Pavement (Variable) 200.000 Sy Milled-In Rumble Strip 12.480 Mi Hot Mix Asphalt Intermediate Course Type c 2,112.000 Ton Hot Mix Asphalt Surface Course Type b 16,118.577 Ton Hot Mix Asphalt Surface Course Type c 12,543.547 Ton Driveway Paving-Surface Type c 1,323.000 Ton Permanent Construction Signs (Ground Mounted) 3,056.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 41,080.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 198,340.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 8,906.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 4,560.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 1,945.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 48.000 Ea White Single Bike Lane Arrow (Lt, Straight, Rt)-Fast Dry Paint 22.000 Ea Railroad Crossing Symbols - Fast Dry Paint 6.000 Ea Bike Lane Symbol - Fast Dry Paint 22.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 36,640.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 493,704.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 10,370.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 90,458.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 4,453.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 2,240.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 935.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 24.000 Ea White Word Message "School" -Thermoplastic - 125 Mil. 2.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 9,160.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 115,846.000 Lf Bike Lane Symbol -Preformed Thermo - 60mil 11.000 Ea Bike Lane Arrow - Preformed Thermo - 60mil 11.000 Ea Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 457.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 611.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,731.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 1,050.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 18,850.000 Lf Sawcut For Loop Detector 6,850.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 15.000 Ea Furnish & Install Video Detection Camera w/ Hardware & Lead-In 10.000 Ea Reset Guardrail 1,059.000 Lf Reserved Use 8057100 2.000 Ea Reset350 Qualified Leading Type t Tl3 (50`) 2.000 Ea Thrie Beam g.r.Bridge Conn. 2.000 Ea Permanent Grassing For Small Projects 8.136 Acre Sediment Tubes For Ditch Checks 60.000 Lf Silt Fence 500.000 Lf | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |