Similar Projects
Grading Erosion and Sediment Control GESC Services
Post-Bid
Lakewood, CO 80227

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Sky Ranch Phase 2 Grading Project
Results
Lakewood, CO 80033

Addenbrooke Park Pond Renovations
Results
Lakewood, CO

Handrail Improvements at Maverick Mesa Park
Infrastructure
Post-Bid
Arvada, CO

Bayou Ditch Culvert Replacement
Results
$70,000 to $90,000 est. value
Wheat Ridge, CO 80033

Detention Ponds Improvement Project
Infrastructure
Post-Bid
$550,000 to $600,000 est. value
Golden, CO

Pipe Stockpile Tarp
Results
Arvada, CO 80002

Outfall Structures Improvement Project
Infrastructure
Post-Bid
CO

Sky Ranch Cab Filing 4 Wet Utilities Project
Results
Lakewood, CO 80227

Whisper Village
New Construction, Alteration
Post-Bid
Arvada, CO

Us 285 Sinkhole/Culvert Repair
Results
CO

Church Ditch Arapahoe Street Box Culvert
Infrastructure
Post-Bid
Golden, CO 80401

Removal of Portions of Present Structure, Removal of Fence and Facing Block
Results
Denver, CO 80239

Taft Park Site Improvements
Infrastructure
Post-Bid
$300,000 est. value
Lakewood, CO 80215

Last Updated 06/27/2022 02:17 PM
Project Title

Guanella Reservoir 2022 Reclamation Project

Physical Address View project details and contacts
City, State (County) Golden, CO   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Re-establish an access road along the western fence line of the permit boundary. Approximately 520 LF – 30-ft wide access road – 6” class 6 road base. Also includes a turn-around area of approximately 120-ft x 65-ft. Includes subgrade prep, fine grading, and compaction of gravel base material. 2) Mitigation of Saline Soil Areas Excavate areas outside of access road that have failed to have vegetation re-established due to saline soils (Mitigation Areas). Excavated materials from mitigation area will be spread evenly across the permanent staging area. These areas will be identified with the Contractor by the City or representative prior to initiating excavation. Install geosynthetic clay liner in mitigation areas. Furnish, deliver, and install imported subsoil to apply to the bottom 18-inches of the mitigation area. Furnish, deliver, and install imported topsoil to apply to the top 6-inches of the mitigation areas, and the other harvested areas. Topsoil should be within acceptable range of pH, alkalinity/salt tolerance, organic matter, etc. suitable for the native grasses as specified for revegetation. Complete fine grading of planting soil. 3) Complete revegetation (seeding/mulching/etc.) as specified. 4) Install and maintain ancillary erosion control best management practices.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents