Similar Projects
Linn Grove Cemetery Roadway Repairs - 304.1527 - City of Greeley
Infrastructure
Conception
$345,000 CJ est. value
Greeley, CO 80631

10th Street and 50th Avenue Signal - 312.23 - City of Greeley
Infrastructure
Conception
$500,000 CJ est. value
Greeley, CO 80634

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

Flying Circle Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Dacono, CO 80514

37th Street Widening Phase 1
Infrastructure
Bidding
$4,000,000 CJ est. value
Evans, CO 80620

South Canyon West Road Project
Infrastructure
Bidding
$500,000 CJ est. value
New Raymer, CO 80742

Harmony Ridge Neighborhood Park
Infrastructure
Post-Bid
$300,000 CJ est. value
Windsor, CO 80550

Firestone - Traffic Signal and HAWK Signal
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Firestone, CO 80520

World-Wide Water Storage Tank Remediation
Term Contract
Results

Z--Bgndrf Glass Fused to Steel Storage Tanks Maintenance and Repairs
Results

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Immaculata Plaza II (New Build) and I (Renovation)
New Construction, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Greeley, CO 80631

Residence Inn by Marriott
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Greeley, CO 80634

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

104th Avenue - South Platte River To Highway 85 Widening - City of Commerce City
Infrastructure
Conception
$6,916,000 CJ est. value
Commerce City, CO 80603

Last Updated 01/05/2023 11:31 PM
Project Title

Bellvue Two Million Gallon Clearwell - N39 - City of Greeley

Physical Address View project details and contacts
City, State (County) Greeley, CO 80639   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $5,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of work for the construction of a two million gallon (mg) clearwell, piping, and chemical injection in tandem with the existing clearwell. As January 06, 2023, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents