Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

USH 45, City of Fond Du Lac Ex-jt Payment 7 of 11 FY23
Infrastructure
Design
$750,000 to $1,000,000 est. value
Fond du Lac, WI

2022 Bridge Maintenance
Infrastructure
Bidding
$290,000 CJ est. value
Fond du Lac, WI 54935

2022 Bridge Maintenance
Infrastructure
Bidding
$290,000 CJ est. value
Fond du Lac, WI 54935

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

LRIP Maple Drive - 2021 Road Project
Post-Bid
Campbellsport, WI 53010

Ancillary Structure Rehab / Replace 2021, Locations on STN Per Annual Plan
Results

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphalt Paving Contract Alley
Infrastructure
Bidding
$90,000 CJ est. value
Waupun, WI 53963

LRIP Pulverizing and Repaving
Post-Bid
WI

Northeast Region-Wide Deck Sealing FY21, Various Backbone Routes STH, Northeast Region-Wide Deck Sealing FY21, Various 3R/LCB Routes STH
Results

Asphalt Paving Contract Shaler Park
Infrastructure
Bidding
$15,500 CJ est. value
Waupun, WI 53963

Road Work
Infrastructure
Post-Bid
Campbellsport, WI

Fond du Lac - Plymouth, USH 151 - Seven Hills Road
Results
Fond du Lac, Plymouth, WI

Last Updated 07/27/2022 04:10 AM
Project Title

Pardeeville - Manchester Const/ Structure Replacement

Physical Address View project details and contacts
City, State (County) Ripon, WI 54971   (Fond du Lac County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pardeeville - Manchester Fox River Structure Const/ Structure Replacement Shr Bridges Estimate Anticipated Funding $750,000 - $999,999 As of July 27, 2022, the project is in Conceptual status. Anticipated letting date is November 14, 2023. WisDOT - Pardeeville - Manchester Const/ Structure Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents