Reported 12/08/2021 12:00 AM
Project Title

Walled Lake-Novi WWTP Treatment Tank Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Novi, MI 48377   (Oakland County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For improvements to the North and South tanks located at the Walled Lake- Novi Wastewater Treatment Plant (WWTP). The first phase of this work was completed in 2021 for the East and West tanks at the same location. This work includes removal and replacement of two clarifier mechanisms, removal and replacement of valves, removal and replacement of electrical motor starters and disconnects, concrete repair of two cast-in-place open-top tanks, repair of existing interior steel walls of tanks, and provision of coating systems on steel and concrete walls, in accordance with all project specifications, drawings, and documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents