T. Rockland, CTH JJ, Manitowoc River Bridge
New Construction, Infrastructure
Bidding
WI

T. Two Rivers, East Hillcrest Road, East Twin River Bridge and Approaches
Infrastructure
Bidding
$750,000 to $999,999 est. value
Manitowoc, WI

2021 Cold-In-Place Asphalt Recycling
Post-Bid
Manitowoc, WI

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Chip and Seal Surfacing
Infrastructure
Bidding
$80,000 est. value
Cleveland, WI

Portland Cement Concrete Road Reconstruction
Post-Bid
Two Rivers, WI 54241

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Double Chip and Seal
Infrastructure
Bidding
$140,000 est. value
Cleveland, WI

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

2021 Road Improvements (TRID)
Results
Less than $480,000 est. value
Two Creeks, WI

Crack Fill
Alteration
Bidding
$140,000 est. value
Cleveland, WI

Pavement Repair
Post-Bid
Cleveland, WI 53015

2021 Utility Improvements - Madison Street and 25th Street
Results
Two Rivers, WI 54241

Last Updated 04/25/2022 10:58 PM
Project Title

2022 Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Cleveland, WI   (Manitowoc County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: Utility Construction • Approximately 3,675 feet of PVC water main (6-inch, 8-inch and 10-inch) including valves hydrants, appurtenances and services. • Approximately 3,225 feet of storm sewer including inlets, manholes, HDPE, RCP and CMP pipe (12-inch thru 24-inch). Roadway Construction • Approximately 3,525 feet of roadway reconstruction including excavation, geotextile fabric, dense graded base, hot mix asphalt, driveway replacement, rip rap and concrete curb & gutter • Tree removal, clearing, grubbing, site restoration, traffic control and erosion control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents