Similar Projects
Last Updated | 10/05/2021 11:03 AM |
Project Title | BIA Tohajiilee Dam Rehabilitation, Albuquerque, NM |
Physical Address | View project details and contacts |
City, State (County) | Albuquerque, NM (Bernalillo County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PRINCIPAL COMPONENTS OF WORK A. Excavation, removal, and disposal of existing structures and items. B. Clearing and grubbing construction areas of vegetation and rubbish. C. Stripping and stockpiling of topsoil from construction areas. D. Removing water from work areas and controlling water to prevent flow of water into work areas. E. Excavating, placing, and compacting access roadway embankment, drainage provisions, and gravel surfacing. F. Excavation of material from dam embankment and foundation. G. Excavation for structures. H. Excavation and grading of new spillway discharge channel. I. Processing, placing, and compacting Zone 1/1A fill materials. J. Furnishing, placing, and compacting Zone 2 sand filter materials for inclined filter in dam embankment. K. Furnishing, placing, and compacting Zone 2 sand filter and Zone 3 gravel drain materials for gravel drain at or near dam embankment. L. Furnishing and installing geotextile. M. Furnishing and placing rock riprap and riprap bedding. |
||||||
Details | Dam/Tunnel, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |