Similar Projects
Tunnel Repairs Phase VI - A
Results
Las Cruces, NM

3735 Tunnel Repairs Phase VI-B
Renovation
Results
Las Cruces, NM

The Heredia Community Ditch Diversion project
New Construction, Infrastructure
Bidding
San Lorenzo, NM

Design and Construction of a New Ditch Diversion
New Construction
Post-Bid
Turley, NM

Bonito Lake Infrastructure Improvements
Renovation
Results
$3,930,000 est. value
Alamogordo, NM

Jemez Mountain Watershed Restoration
Results
Los Alamos, NM 87544

Cookes Peak West Mine Safeguard Project-Phase IIIb
Results
Less than $370,215 est. value
Deming, NM

Lisboa Diversion Dam Replacement
Results
Pecos, NM

Luna Irrigation Ditch Diversion Structure
New Construction
Results
$150,000 est. value
NM

Construction: Tunneling/Earthwork
Post-Bid
Las Cruces, NM

Last Updated 10/05/2021 11:03 AM
Project Title

BIA Tohajiilee Dam Rehabilitation, Albuquerque, NM

Physical Address View project details and contacts
City, State (County) Albuquerque, NM   (Bernalillo County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PRINCIPAL COMPONENTS OF WORK A. Excavation, removal, and disposal of existing structures and items. B. Clearing and grubbing construction areas of vegetation and rubbish. C. Stripping and stockpiling of topsoil from construction areas. D. Removing water from work areas and controlling water to prevent flow of water into work areas. E. Excavating, placing, and compacting access roadway embankment, drainage provisions, and gravel surfacing. F. Excavation of material from dam embankment and foundation. G. Excavation for structures. H. Excavation and grading of new spillway discharge channel. I. Processing, placing, and compacting Zone 1/1A fill materials. J. Furnishing, placing, and compacting Zone 2 sand filter materials for inclined filter in dam embankment. K. Furnishing, placing, and compacting Zone 2 sand filter and Zone 3 gravel drain materials for gravel drain at or near dam embankment. L. Furnishing and installing geotextile. M. Furnishing and placing rock riprap and riprap bedding.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents