Similar Projects
Bridlewood Drive Culvert Replacement - City Of Concord
Infrastructure
Conception
$1,765,000 est. value
Concord, NC 28025

Grading, Drainage and Paving on Raleigh Road Parkway
Infrastructure
Bidding
$400,000 est. value
Wilson, NC 27893

Grading, Drainage, Paving, and Walls
Infrastructure
Bidding
$2,000,000 est. value
Clayton, NC 27520

Erosion Control - Grading Project
Infrastructure
Post-Bid
Cameron, NC 28326

Downtown Pedestrian Improvement Phase I Project
Infrastructure
Post-Bid
Waxhaw, NC

Drysdale Drive Extension
Results
NC

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Carriage Park Entrance Culvert Rehabilitation
Construction
Hendersonville, NC 28791

Grading, Paving, Erosion Control on at the Intersection of NC 87
Infrastructure
Bidding
$3,000,000 est. value
Spring Lake, NC 28390

Corrugated Aluminum Pipe
Infrastructure
Post-Bid
Richlands, NC 28574

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Results
Fayetteville, NC 28307

Corrugated Polypropylene Pipe
Infrastructure
Bidding
Washington, NC 27889

Apex Warehouse - Drainage Rehabilitation
Infrastructure
Post-Bid
Apex, NC 27502

Stream Debris Removal: Stretches within the Lower Little River, Anderson Creek,and Upper Little River
Term Contract
Results
$1,638,347 est. value
Lillington, NC

Ting Stadium Structure and Drainage Repair
Renovation, Infrastructure
Post-Bid
Holly Springs, NC 27540

Reported 07/18/2022 03:59 PM
Project Title

Dylan Place Culvert Replacement - Upper - City Of Concord

Physical Address View project details and contacts
City, State (County) Concord, NC 28027   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $1,149,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

These culvert replacements and upsizings under Dylan Place in two locations is to reduce flooding risk to neighborhood homes and replace aging infrastructure. As of July 16, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents