Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Fowler Connection (Huffine to Oak) - SIF114 - City of Bozeman
Infrastructure
Conception
$8,000,000 CJ est. value
Bozeman, MT 59718

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Southside Lofts
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Bozeman, MT 59715

Town of Wibaux Wastewater Treatment System Upgrades Project
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Wibaux, MT 59353

Little Sheep Cabin Renovation
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Lima, MT 59739

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Trail Creek Salvage Road Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Helena, MT 59601

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

Creekside Commons
New Construction, Infrastructure
Pending Verification
$13,579,200 CJ est. value
Kalispell, MT 59901

Parkland Meadows Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Kalispell, MT 59901

Griffin (7th to Rouse) - Construction - SIF113 - City of Bozeman
Infrastructure
Conception
$2,700,000 CJ est. value
Bozeman, MT 59715

Last Updated 08/24/2022 02:35 PM
Project Title

Art House Cinema Expansion

Physical Address View project details and contacts
City, State (County) Billings, MT 59101   (Yellowstone County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Site Development, Theaters/Auditoriums
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the expansion of an existing single-screen theater. The expansion will create three screening rooms and will also include renovations to the lobby and kitchen. The total square footage of the project has not been announced. As of August 24, 2022, a building permit is under review with the City of Billings. Construction could begin in late-2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Foodservice Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Broadcast, Theater, and Stage Equipment, Recreational Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems.
Division 28 - Electronic Safety and Security, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents