Reported | 06/07/2019 12:00 AM |
Project Title | York Correctional Central Plant and Distribute System |
Physical Address | View project details and contacts |
City, State (County) | Niantic, CT 06357 (New London County) |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings, Prison/Jail |
Contracting Method | Competitive Bids. |
Project Status | Sub-Bidding |
Bids Due | View project details and contacts |
Estimated Value | $45,800,000 |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Shall be selected to publically bid the project elements and enter into a Guaranteed Maximum Price (GMP) contract with the State. After consultation with and approval by the DAS Commissioner, the CMR shall award subcontracts to responsible qualified subcontractors submitting the lowest bids to build the Project. The purpose of this project is to completely upgrade both the existing Central Plant and all the underground distribution piping for both high temperature hot water and chilled water, at the York CI facility, Niantic, CT. The existing systems are 24 years old and in poor condition. This project will consist of the installation of approximately 32,000 LF of 10 inch underground piping, (HT/Chilled piping supply/return), which will connect to 18 buildings, starting from the Central Plant. Underground piping replacement shall also include all replacement of all valves and vaults for both heating and chilled water piping systems. The proposed new Central Plant, which will be located next to the existing Plant and would be a single story, approximately 9,700 SF. New Central Plant – will consist of (3) 350 ton chillers with space for a future fourth; cooling tower with 3 cells; (3) 350 hp high efficiency boilers and all associated required pumps, valves and chemical treatment accessories. The existing buildings have no basements so the new underground piping will need to be piped in various directions to enter the existing mechanical rooms in each building. The York CI facility is an all-women’s prison facility and the contractors working inside the perimeter fence lines, must conform to DOC Security Guidelines and restrictions. | ||||||||||||||||||||||||||||||||||||||||||
Details | Misc. Buildings, 9,700 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |