Similar Projects
Reported | 03/17/2022 12:00 AM |
Project Title | Twenty-Five 25 Site Basic Preventative Maintenance Program |
Physical Address | View project details and contacts |
City, State (County) | Cleveland, OH 44110 (Cuyahoga County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Services: 1) Filter Changes (new media and labor for removal, disposal and installation). a) Air Handling Units (AHU/DOAS) Pre-Filters: 3 times per year per set. b) AHU/DOAS AFTER-Filters: 1 time per year per set. c) Air & Water Terminal Units: 1 time per year per terminal. d) Water Source Heat Pumps: 2 times per year per unit. e) Variable Refrigerant Flow (VRF) Terminal Units: Clean-Wash or Replace 2 times per year per unit. 2) Motor Belt Maintenance: 1 time per year per motor. 3) Motor Lubrication Maintenance: 1 time per year per motor. Scope of Work Included Equipment per School – to be cross-referenced by supplemental documents published AND field-verified at each site for accuracy: a. Reference Documents available can be found at the above-published Cloud Site. b. Refer to MASTER Group Schedule of known HVAC Equipment installed, (to be fieldverified): 1) Air Handling Units 2) Boilers 3) Chillers 4) Condensing Units 5) Dedicated Outside Air Systems 6) Dry & Fluid Coolers 7) Open Cooling Towers 8) Split DX AC Units 9) Exhaust Fans 10) Fan Coil Units 11) Unit Ventilators 12) Water Source Heat Pumps 13) Variable Refrigerant Flow Systems 14) Makeup Air Units 15) Hydronic Pumps 16) Glycol Makeup Units 17) Air Terminal Units 18) Heating Terminal Units 19) Intake Air Louvers. Site Visit details: Third site visit on 3/7/2022 at 8:00 AM at Lakeside Digital Arts/Davis Aviation & Maritime and at 10:30 AM at Michael R. White and at 1:00 PM at Alfred A. Benesch and at 3:30 PM at Bolton. Fourth site visit on 3/8/2022 at 8:00 AM at Dike School for the Arts and at 10:30 AM at East Technical High School and at 1:00 PM at Washington Park Environmental Studies and at 3:30 PM at Luis Munoz Marin. Fourth site visit on 3/9/2022 at 8:00 AM at Scranton and at 10:30 AM at Tremont and at 1:00 PM at Kentucky (ex Garrett Morgan) and at 3:30 PM at Bard High School. Fifth site visit on 3/10/2022 at 8:00 AM at Benjamin Franklin and at 10:30 AM at Charles Mooney and at 1:00 PM Clara E. Westropp and at 3:30 PM at Denison. Sixth site visit on 3/11/2022 at 8:00 AM at Douglas MacArthur GLA and at 10:30 AM at Louis Agassiz and at 1:00 PM at Newton D. Baker and at 3:30 PM at Valley View BLA. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |