Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Design-Build Services for Memorial School HVAC
Alteration
Bidding
Cleveland, OH

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

HVAC and Mechanical Products
Term Contract
Post-Bid

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Y--Replacement of AHU-17 & AHU-18 LOUIS STOKES VAMC - CLEVELAND, OH 44106 541-18-104
Results
$5,000,000 to $10,000,000 est. value
Cleveland, OH

HVAC Cleveland Coast Guard
Post-Bid
Cleveland, OH 44114

Municipal HVAC Systems Maintenance
Results
$26,000 est. value
Fairview Park, OH 44126

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

Vehicle Exhaust Removal System
Results
Chagrin Falls, OH 44023

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Domestic Hot Water Boiler Replacement at Laronde Apartments
Results
Shaker Heights, OH 44120

HVAC & Facility Systems, Automation, Installation, Service and Related Products & Services in Ohio
Term Contract
Post-Bid

Campus Wide HVAC Indoor Air Quality Improvements
Results
$1,885,230 est. value
Cleveland, OH 44114

Lincoln West High School Rooftop Equipment (Chiller) Project
Alteration
Post-Bid
Cleveland, OH 44109

Reported 03/17/2022 12:00 AM
Project Title

Twenty-Five 25 Site Basic Preventative Maintenance Program

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44110   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Services: 1) Filter Changes (new media and labor for removal, disposal and installation). a) Air Handling Units (AHU/DOAS) Pre-Filters: 3 times per year per set. b) AHU/DOAS AFTER-Filters: 1 time per year per set. c) Air & Water Terminal Units: 1 time per year per terminal. d) Water Source Heat Pumps: 2 times per year per unit. e) Variable Refrigerant Flow (VRF) Terminal Units: Clean-Wash or Replace 2 times per year per unit. 2) Motor Belt Maintenance: 1 time per year per motor. 3) Motor Lubrication Maintenance: 1 time per year per motor. Scope of Work Included Equipment per School – to be cross-referenced by supplemental documents published AND field-verified at each site for accuracy: a. Reference Documents available can be found at the above-published Cloud Site. b. Refer to MASTER Group Schedule of known HVAC Equipment installed, (to be fieldverified): 1) Air Handling Units 2) Boilers 3) Chillers 4) Condensing Units 5) Dedicated Outside Air Systems 6) Dry & Fluid Coolers 7) Open Cooling Towers 8) Split DX AC Units 9) Exhaust Fans 10) Fan Coil Units 11) Unit Ventilators 12) Water Source Heat Pumps 13) Variable Refrigerant Flow Systems 14) Makeup Air Units 15) Hydronic Pumps 16) Glycol Makeup Units 17) Air Terminal Units 18) Heating Terminal Units 19) Intake Air Louvers. Site Visit details: Third site visit on 3/7/2022 at 8:00 AM at Lakeside Digital Arts/Davis Aviation & Maritime and at 10:30 AM at Michael R. White and at 1:00 PM at Alfred A. Benesch and at 3:30 PM at Bolton. Fourth site visit on 3/8/2022 at 8:00 AM at Dike School for the Arts and at 10:30 AM at East Technical High School and at 1:00 PM at Washington Park Environmental Studies and at 3:30 PM at Luis Munoz Marin. Fourth site visit on 3/9/2022 at 8:00 AM at Scranton and at 10:30 AM at Tremont and at 1:00 PM at Kentucky (ex Garrett Morgan) and at 3:30 PM at Bard High School. Fifth site visit on 3/10/2022 at 8:00 AM at Benjamin Franklin and at 10:30 AM at Charles Mooney and at 1:00 PM Clara E. Westropp and at 3:30 PM at Denison. Sixth site visit on 3/11/2022 at 8:00 AM at Douglas MacArthur GLA and at 10:30 AM at Louis Agassiz and at 1:00 PM at Newton D. Baker and at 3:30 PM at Valley View BLA.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents