Similar Projects
Howard Street Phase 2, Cleveland Park Area Waterline Rehabilitation Project
Post-Bid
Spartanburg, SC 29301

Clem's Brand/Sugar Creek Interceptor Phase III
Post-Bid
SC

East Main Street at South Anderson Road Waterline
Results
Rock Hill, SC

Replacement of All Existing Waterlines and Meters
Results
Less than $2,859,092 est. value
Bethune, SC 29009

Water Sewer System Improvements - Connelly Road - 6" Main
Post-Bid
Pickens, SC

Ehrenclou Drive Water and Sewer Line Extensions
Results
Less than $199,038 est. value
Camden, SC 29020

Joanna Waterline Improvements
Post-Bid
SC

Highway 327 and Highway 57 Water Line Relocation
Results
Florence, SC

Highway 72 Distribution Main
Post-Bid
SC

Calhoun Avenue 12-Inch Water Main Replacement
Results
Less than $486,218 est. value
Greenwood, SC

Creekview Drinking Water Distribution Rehabilitation Project
Post-Bid
$150,000 to $200,000 est. value
Clemson, SC

Kitson Street/Lowell Avenue 6-Inch Water Main Replacement
Results
Less than $505,400 est. value
Greenwood, SC 29648

Kaolin Road Waterline Improvements
Post-Bid
Aiken, SC 29801

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Berkeley County Master Meter
Post-Bid
SC

Last Updated 01/07/2020 11:53 AM
Project Title

Utility Relocation for the US 76 Widening Truck Route Intersection Improvements

Physical Address View project details and contacts
City, State (County) Florence, SC 29501   (Florence County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be completed consists of furnishing all materials, equipment, and labor necessary to construct approximately 2,030 linear feet of 6” water line relocation improvements, 2,013 linear feet of 6” water line abandonment, 163 linear feet of 12” steel casing jack & bore, fire hydrant assemblies, and appurtenances in coordination with the roadway improvements by a contractor procured separately by the SCDOT, as shown in the plans and technical specifications to complete the project. The successful bidder will be provided a window of time prior to roadway project construction beginning for installation of the utility improvements and will be required to work closely with the SCDOT’s roadway contractor to schedule the work through completion.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents