Similar Projects
Last Updated | 11/22/2019 08:36 PM |
Project Title | Adonis Lift Station and Force Main |
Physical Address | View project details and contacts |
City, State (County) | Marana, AZ (Pima County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town intends to construct a new lift station and 2,670 feet of force main to convey wastewater flows from the Adonis MHP collection system to the Town of Marana collection and treatment system. The Town also intends to discontinue use of the existing wastewater evaporation basins and to decommission the existing lift station that currently serves the Adonis MHP. This will allow wastewater from the Adonis MHP to be treated at the Marana Water Reclamation Facility. At the new lift station, the project will include a standby generator and SCADA connectivity to communicate with the Town’s existing system. The project also includes an access road that provides vehicle access to the new lift station. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |