Similar Projects
Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Bush Bros Drive Sanitary Sewer and Watermain Extensions
Infrastructure
Post-Bid
$690,000 est. value
Augusta, WI 54722

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

City Wide Valve and Hydrant Replacement
Results
Eau Claire, WI

City Wide Water Service Replacement
Results
Eau Claire, WI

Rehabilitation of Sewage Manholes
Results
Eau Claire, WI

Sam Davey ES Water Mains Alterations
Results
Eau Claire, WI 54703

Cannery District Street Improvements
Results
WI

City Wide Street and Utility Reconstruction
Infrastructure
Results
Eau Claire, WI

City Wide Water Utility and Curb Replacement
Infrastructure
Results
Altoona, WI

Bradwood Avenue Reconstruction
Infrastructure
Results
Altoona, WI 54720

Kane Road (Folsom Street to STH 312) Reconstruction
Infrastructure
Results
Eau Claire, WI 54703

City Wide Street and Utility Reconstruction
Infrastructure
Results
Eau Claire, WI

Southwest Sanitary Sewer Interceptor Replacement
Infrastructure
Results
Eau Claire, WI

Central Maintenance Facility Trench Drains and Catch Basin Repair/Replacement
Infrastructure
Results
Eau Claire, WI 54703

Reported 03/30/2022 12:00 AM
Project Title

Sanitary Sewer and Watermain Extensions

Physical Address View project details and contacts
City, State (County) Augusta, WI   (Eau Claire County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected September 2022
Bids Due View project details and contacts
Estimated Value $690,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Traffic control, erosion control, pulverizing & stockpiling existing pavement, sanitary sewer, watermain, sewer & water services, excavation, grading, placement of recycled asphalt base, aggregate base, hot mix asphalt, aggregate shouldering turf restoration. This project includes the connecting sewer and water mains for Pumphouse/Treatment #11 being constructed under separate contracts. The mains are constructed along Bush Bros Drive, which is also CTH G, from the Bush Bros plant south to Sandy Hill Drive. A new private service is also included. Additional Description: 2,088 lin.ft. 8” PVC Sewer 2,167 lin.ft. 10” PVC Watermain 5,650 sq.yds. Pulverize Pavement 2,460 tons Agg Base, 1,290 tons HMA Private Sewer & Water Service Abandon Private Well & Septic Tanks

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents