Similar Projects
St. Aubin Outfall Improvements
Renovation
Bidding
Allen Park, Dearborn, Detroit, Fort Gratiot Township, MI 48214

St. Aubin Outfall Improvements
Renovation
Bidding
Allen Park, Dearborn, Detroit, Fort Gratiot Township, MI 48214

Drinking Water Treatment Plant Filter Additions and Controls Upgrade
Post-Bid
East Lansing, MI

Wastewater Treatment Plant Membrane System Improvements
Post-Bid
Michigan Center, MI

Water Treatment
Results
Waterford, MI 48328

Wastewater Treatment Plant Upgrades - Screw Pump #3
Results
Mount Pleasant, MI 48858

WPCF Secondary Clarifier Improvements
Renovation
Bidding
$5,800,000 est. value
Flint, MI

25-2 Filter Media Replacement
Post-Bid
Waterford, MI

Water Treatment Plant Upgrades-Division A: Iron Removal Filter Replacement
Results
Clare, MI 48617

Northeast Water Treatment Plant Flocculator Replacement
Renovation
Bidding
Detroit, MI

Water Plant Filtration Building Improvements
Renovation
Post-Bid
Algonac, MI 48001

Baby Creek CSO TTS Anchor and Wedge Repairs
Results
Less than $762,500 est. value
Detroit, MI

Water Plant Filter Additions and Controls Upgrade
Addition
Post-Bid
East Lansing, MI

Chemical Systems Feed Building
Results
Flint, MI

Water and Wastewater Treatment On-Call Construction Services
New Construction
Post-Bid
Saline, MI

Last Updated 07/02/2021 01:48 PM
Project Title

WRRF Clarifier and Aeration Improvements Project

Physical Address View project details and contacts
City, State (County) East Lansing, MI   (Ingham County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of improvements to the East Lansing Water Resource Recovery Facility (WRRF) clarifier tanks and aeration system including: replacement of the mechanisms, gates, and weirs in the north and south primary clarifiers, replacement of the mechanisms and construction of new effluent trough in the 90 ft diameter north final clarifiers, construction to two 75 ft diameter north final clarifier tanks, construction of building addition for new final clarifier return activated sludge pumps, replacement of the existing coarse bubble diffusers in the north and south aeration tanks with fine bubble diffusers, modification to the existing aeration flow configuration with replacement of existing slide gates and construction of new aeration tank effluent troughs, replacement of existing north aeration blowers and modifications to the aeration piping and controls to improve operation. In addition, the work will include concrete restoration, removal of existing equipment, improvements to the existing heating and ventilation system, and electrical and instrumentation improvements.

Details

Water Treatment Plant, Demolition.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents