Similar Projects
69th Street Wastewater Treatment Plant - R-000509 - City of Houston
Renovation
Conception
$32,740,000 est. value
Houston, TX 77011

Construct Backup Generator at Water Treatment Plant - City of Sherman
Renovation
Conception
$1,640,000 CJ est. value
Sherman, TX 75092

Lookout Lane Pump Station Improvements - 2006.02 - City of Austin
Renovation
Design
$501,000 CJ est. value
Austin, TX 78746

Dos Rios and Leon Creek Wrcs Electrical System Improvements - Phase II
Renovation
Design
$25,400,000 CJ est. value
San Antonio, TX 78205

Auger Water Treatment Plant Expansion to 24 MGD
Renovation, Infrastructure
Bidding
$22,000,000 CJ est. value
Midlothian, TX 76065

Harris County Utility District No. 6 - Water Plant No. 1 FEMA Replacement and Mitigation
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Houston, TX 77002

Sunfield WWTP Expansion to 0.99 MGD - Package 9
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Buda, TX 78610

WWTP Improvements TWDB
Post-Bid
Huntington, TX

South Mesquite Creek Regional Wastewater Treatment Plant Peak Flow Management and Expansion Project
Addition
Post-Bid
$121,000,000 est. value
Mesquite, TX

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

North Waste Water Treatment Plant Headworks Replacement Project
Results
Austin, TX

Wastewater Plant Phase One
New Construction
Construction
TX

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

Dallas Salmon Wastewater Treatment Facility
Renovation
Pending Verification
League City, TX

Wastewater Treatment Facility 4.0 MGD AADF Expansion - 571 - City of San Marcos
Addition, Demolition, Infrastructure
Conception
$20,500,000 CJ est. value
San Marcos, TX 78666

Last Updated 09/13/2022 10:02 PM
Project Title

Simsboro Aquifer Water Supply Facilities - Package 3 - Treatment Equipment Procurement

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $35,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bastrop is in the process of converting its water supply source from shallow alluvial wells primarily fed by the Colorado River to deep wells that draw from the Simsboro Aquifer; which will provide the City with a reliable, resilient, drinking water supply. This Package is for the procurement of the Treatment Equipment, Generator and ATS. The project consists of the following: A new well field and production facilities Three additional wells are needed to meet Phase 1 flows, which consist of an average production capacity of 3 MGD and a peak capacity of 6 MGD. Water collection piping and access roads will be installed to each of the new wells. Groundwater treatment facilities Based on water quality sampling, a WTP primarily focusing on iron and manganese removal is needed. It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building. Low Lift pump station Once treated, water will be pumped from the filter effluent to a 0.5 MG clearwell through the Low Lift pump station Ground Storage Tank (clearwell) 5 MG clearwell, Backwash pump station Backwash pumps will pull water from the clearwell and send it through the treatment plant to clean the filters Transmission piping - water will be conveyed through the 24-inch diameter, 21,500 lf transmission pipeline to GSTs at the Willow Site. Lift Station and Force Main A 21,500 lf wastewater forcemain will run along the same route as the transmission pipeline to convey wastewater generated during filter backwash and in the Filter Building to the City's wastewater collection system. Associated services Electrical and instrumentation Site development and access Various site improvements, paving, grading, fencing, landscaping. *The value reflects that of the overall project and not this particular package.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents