Similar Projects
Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Pump Stations Controls Upgrade and Maintenance
Results
Less than $60,000 est. value
Weston, FL 33326

RAS Pump Station No.1 Replacement
Results
Less than $3,600,000 est. value
Hollywood, FL 33020

Pump Station A-7 Upgrade P12415
Results
$1,300,000 est. value
Fort Lauderdale, FL 33301

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Irrigation Pump Station Replacement at Pine Trails Park
Results
Parkland, FL 33067

Lift Station Replacement- Lift Station No. 71
Results
$223,176 to $642,640 est. value
Plantation, FL 33317

Utility Analysis Zone 123
Results
Less than $20,340,061 est. value
Lauderdale Lakes, FL

Lift Station Improvement Project
Results
Wilton Manors, FL 33305

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

Design-Build Pump Station B-4 Force Main P12567
New Construction
Results
Fort Lauderdale, FL 33301

B-22 Pumping Station Replacement
Results
Fort Lauderdale, FL 33301

Tract 27 Booster Station Upgrades Project
Results
Less than $1,755,000 est. value
Tamarac, FL 33321

SW 130th Avenue Force Main and Lift Station 309 Improvements
Results
Davie, FL 33024

Sewer Lift Station Rehabilitation and Repair
Term Contract
Bidding
FL

Last Updated 04/30/2020 12:05 PM
Project Title

Lift Station #8 Replacement

Physical Address View project details and contacts
City, State (County) Hallandale, FL 33009   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,758,348
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The work shall be complete, and all work, materials, and services not expressly shown or called for in the Contract documents which may be necessary for the complete and proper construction of the work in good faith shall be performed, furnished, and installed by the Contractor as though originally

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents