Similar Projects
Brookside Ranch
New Construction
Conception
West Bountiful, UT 84087

East Capitol Residential
New Construction
Design
$480,000 est. value
Salt Lake City, UT 84103

Village at the Bluff
New Construction
Design
Syracuse, UT

Housing Rehabilitation Construction Services
New Construction
Bidding
Ogden, UT

Construction Of Five (5), Single-Family Homes
New Construction
Post-Bid
Panguitch, UT 84759

Replacement Home
New Construction
Post-Bid
Roosevelt, UT

Construction of a Single-Family Residence
Results
Ogden, UT

Housing Rehabilation Construction Services
Results
Ogden, UT 84201

27th Street Collective
New Construction - 12,800 SF
Construction
$1,600,000 est. value
Salt Lake City, UT 84106

Erin Hills Estates
New Construction
Construction
West Valley City, UT 84128

Taylor Meadows
New Construction
Pending Verification
Lehi, UT 84043

Hamlet Development
New Construction
Pending Verification
Murray, UT 84123

LHM Jordan Commons
New Construction
Design
Sandy, UT

Housing Maintenance Services
Renovation
Post-Bid
Fort Duchesne, UT

Building Tenant Improvements Project
Renovation, Demolition - 20,800 SF
Results
Price, UT

Last Updated 08/05/2022 12:01 AM
Project Title

Rehabilitation Construction of Single-Family Residence at 919 Rushton Street

Physical Address View project details and contacts
City, State (County) Ogden, UT 84401   (Weber County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $276,096 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Ogden City Corporation is accepting sealed bids from General Contractors for the rehab construction of a single-family residence located at 919 Rushton Street, Ogden, Utah. Bid packet information and documents will be provided at time of bid walk. Licensed contractors submitting bids must be able to comply with insurance and bonding requirements; and have experience with construction of multiple historic architecture style homes. Proof of Certification for Lead Based Paint Safe Work Practices is required at time of bid submittal or able to obtain within 6 weeks after bid acceptance. In view of the fact that this project is funded in part with federal monies provided in this contract, each prospective contractor shall comply with the bid requirements set forth in Executive Order 11625 and Section 3 of the Housing and Urban Development Act of 1968. In addition to the aforementioned bid requirements, the contractor awarded the bid, and each subcontractor and lower tier contractor thereafter shall be subject to the following federal contract provisions: -Executive Orders 11246 (Equal Employment Opportunity) and 11625, and Section 3 of the Housing and Urban Development Act of 1968 regarding employment, training and contracting opportunities (12 U.S.C. 1701u). 'The work to be performed under this bid specification / contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended. The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD- assisted projects covered by Section 3 shall, to the greatest extent, feasible be directed to low- and very-low income persons, particularly persons who are recipients of HUD assistance for Housing. Ogden City reserves the right to accept or reject any proposal that best serves the interests of Ogden City. Ogden City will accept bids from contractors who have qualified under Ogden City's Request for Qualifications process.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents