Similar Projects
Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

WWTP Improvements Phase I
New Construction
Bidding
Stevenson, WA 98648

Wastewater Treatment Facility Upgrade
New Construction
Bidding
$16,800,000 to $17,800,000 est. value
Sultan, WA 98294

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Post-Bid
$15,000,000 est. value
Seattle, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

WWTP Digester 4
New Construction
Results
$13,244,000 est. value
Wenatchee, WA

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

Post Point Sludge Pump System Replacement
Renovation, Addition
Results
$1,100,000 to $1,500,000 est. value
Bellingham, WA 98225

West Point Treatment Plant Primary Sedimentation Tank Coating
Renovation
Design
$3,700,000 est. value
WA

WWTP Improvements Phase I - Major Equipment
New Construction
Post-Bid
Stevenson, WA

Wastewater Treatment Facility Operations Building Restoration
Renovation
Results
$1,500,000 est. value
Bridgeport, WA

Last Updated 03/17/2022 11:50 AM
Project Title

MBR Equipment for Train 4

Physical Address View project details and contacts
City, State (County) Duvall, WA 98019   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing MBR Trains 1, 2, and 3 are already operating with SUEZ membranes. The MBR equipment would be installed, under a separate contract, by a general contractor. The MBR equipment would be installed outside in Train 4 and the blower and permeate pump will be installed inside the MBR Building.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents