Similar Projects
Department Public Work Facility Repairs Phase 2 Roof, Siding, Insulation - City of Monona
Renovation
Conception
$1,540,000 CJ est. value
Monona, WI 53716

New Operations Facitily - Sun Prairie Utilities
New Construction - 82,500 SF
Design
$22,000,000 CJ est. value
Sun Prairie, WI 53590

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Rotunda - Plaster and Decor Finish Ceiling Panel Restoration
Renovation
Bidding
$475,400 CJ est. value
Madison, WI 53703

Willard / Sommers / Center / Hudson / Miller Reconstruction
Renovation
Bidding
$117,000 CJ est. value
Madison, WI 53715

Elvehjem Building Envelope Renovation - University of Wisconsin - Madison
Renovation
Sub-Bidding
$8,169,227 CJ est. value
Madison, WI 53706

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Valve Boxes
Term Contract
Post-Bid
Madison, WI 53715

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Headquarters Roof Replacement
Renovation, Infrastructure
Construction
$2,282,538 CJ est. value
Madison, WI 53703

Fourth Floor Gaming Remodel
Renovation
Construction
$184,392 CJ est. value
Madison, WI 53713

Plaza Deck Renovation, GEF 2 & 3
Renovation
Pending Verification
$1,392,700 CJ est. value
Madison, WI 53715

Dane County Jail South Tower Addition & Public Safety Building Renovation
Addition, Demolition, Renovation, Infrastructure - 170,000 SF
Design
$170,000,000 CJ est. value
Madison, WI 53703

Madison Public Market
Infrastructure
Bidding
$400,000 CJ est. value
Madison, WI 53715

Last Updated 06/14/2023 02:08 PM
Project Title

State Capitol Skylight Glazing Replacement Upgrades

Physical Address View project details and contacts
City, State (County) Madison, WI 53703   (Dane County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,940,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the replacement of existing insulated glazing units with new insulated glazing units that have 1/4" exterior clear tempered glazing with low-E coating, 1/2" airspace with Argon fill; clear laminated tempered 9/16" glazing with .060 PVB interlayer on the interior. Overall, the glazing unit thickness is 1-5/16", with a winter U-factor of 0.28. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents