Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Ridgegate First Street Lift Station
Results
Lone Tree, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

United Reservoir North Cell Pump Station
Post-Bid
Greenwood Village, CO

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Reported 12/10/2019 12:00 AM
Project Title

Binney Connection Project Treatment and Pumping Package

Physical Address View project details and contacts
City, State (County) Aurora, CO 80010   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $19,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The WISE Binney Connection Treatment & Pumping Project (Project) is located is the City of Aurora and includes a dedicated treatment and pumping system will have a capacity of approximately 30 MGD. Once constructed, the Project will produce potable water from a new pump station and treatment facility at the Binney Water Purification Facility (BWPF). The new facilities at the BWPF site include a flow control valve vault, chemical storage, chlorine contact basin, and finished water pump station.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents