Similar Projects
Installation of Advanced Oxidation Process (AOP) Water Treatment Systems
Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Huntington Station, NY 11746

Parker School Renovations
Renovation
Post-Bid
$500,000 CJ est. value
Cortland, NY 13045

Downtown/Main Street Revitalization and Utility Improvement Project
Infrastructure
Results
$605,000 CJ est. value
Cortland, NY 13045

2021 Capital Project - General Contractor
Renovation
Results
$3,000,000 est. value
Cincinnatus, NY

Armideo Boarding House
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Cortland, NY 13045

Main Street Motor Vehicle Body Repair Shop
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Cortland, NY 13045

Pizza Hut / Cortland
Renovation, Infrastructure - 1,674 SF
Post-Bid
$300,000 CJ est. value
Cortland, NY 13045

2022/23 Capital Outlay Project
Renovation
Results
$400,000 est. value
Cortland, NY 13045

Taco Bell Remodel / Cortland
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Cortland, NY 13045

2022/23 Capital Outlay Project - General Trades Work
Renovation
Post-Bid
$385,000 CJ est. value
Homer, NY 13077

2021 Capital Improvement Project
Renovation
Results
$4,599,000 CJ est. value
Homer, NY 13077

Contento Scrap Processing Office
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Cortland, NY 13045

2021 Capital Improvement Project - General Construction
Renovation
Post-Bid
$4,400,000 CJ est. value
Homer, NY 13077

Byrne Dairy / Cortland
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Cortland, NY 13045

RFP D/B - Townhouse Feasibility Study
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Cortland, NY 13045

Last Updated 03/04/2023 01:02 PM
Project Title

2021 Capital Improvement Project - Site Work

Physical Address View project details and contacts
City, State (County) Homer, NY 13077   (Cortland County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development, Stadium
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,275,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

11-07-01-06-0-007-013,11-07-01-06-0-006-013,11-07-01-06-7-015-003,11-07-01-06-7-023-001 Board of Education, Homer Central School District, herein called the Owner, invites sealed Bids, submitted in duplicate, in accordance with Drawings, Specifications and other Bidding and Contract Document, for the following bid items; Publicly Bid Prime Contractor Contracts HVAC As bid security, each proposal shall be accompanied by a certified check or Bid Bond made out to the Owner, in an amount not less than five percent (5%) of the Base Bid amount, subject to the terms and conditions described in the "Instructions To Bidders." The Owner reserves the right to waive any information in, or to reject, any and all bids. No bidder may withdraw his proposal within forty-five (45) days after the actual date of the opening thereof. Bids must be prepared and submitted in accordance with the Instructions to Bidders. The successful Bidder must furnish a Performance Bond and a Labor and Material Payment Bond in accordance with the Instructions to Bidders. Attention of Bidders is particularly directed to the requirements of the conditions of employment to be observed and the prevailing hourly wage rates and supplements to be paid under the Contract. The Owner reserves the right to reject any or all bids, and the right to waive any informality in any bid. A Bidder whose bid is accompanied by a certified check or other security in accordance with the bidding requirements and public advertisement and who returns a complete set of Bidding Documents in good condition within thirty (30) days following the award of the contract covered by such bidding documents, or the rejection of such bid, shall receive a refund of the full amount of the deposit for one (1) copy of the Bidding Documents, less the actual cost of reproduction of the Bidding Documents, shall be made for the return of all other copies of the Bidding Documents in good condition within thirty (30) days following the award of the contract or rejection of the bids covered by such Bidding Documents. Any complete or partial sets required in excess of maximum issue are to be obtained by the interested parties, at their cost, with no money returned. Bidding documents will be delivered by UPS Ground services upon request and receipt of an additional non-refundable delivery and handling charge of $25.00 per set, payable by separate check to of Hunt Engineers/Architects/Surveyors). Sets can also be overnight delivered to upstate NY locations for a nonrefundable delivery and handling charge of $75.00 per set. All requests for sets to be delivered to locations outside of upstate NY will incur an additional shipping charge based on the metering increase for those locations. Prospective subcontractors and material suppliers may obtain Bidding Documents they require by payment of printing and mailing costs. Attention of the Bidder is particularly called to the Owner's sales tax exemption, the requirements as to conditions of employment to be observed and the minimum wage rates o be paid under the contract. In addition, the bidding Documents fo this project contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has bee named as a party, a statement of surety's intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. HUNT PROJECT NUMBER: 2503.036 HIGH SCHOOL SED # : 11-07-01-06-0-002-016 INTERMEDIATE/ JUNIOR HIGH SCHOOL SED # : 11-07-01-06-0-007-013 ELEMENTARY SCHOOL SED # : 11-07-01-06-0-006-013 EXISTING PRESS BOX SED # : 11-07-01-06-7-015-003 NEW PRESS BOX SED # : 11-07-01-06-7-023-001

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Special Coatings.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents