Similar Projects
DFCM Construction Pre-Qualification (General, Electrical, Mechanical, Roofing, Paving and Civil)
Post-Bid
Less than $3,500,000 est. value
Salt Lake City, UT 84129

Christmas Light Installation Service
Term Contract
Post-Bid
Orem, UT

DFCM Construction-Pre Qualified Electrical - WSU Medium Transformer and Switch Replacement
Results
Less than $190,000 est. value
Ogden, UT 84408

DFCM Construction-Pre Qualified Electrical-WSU Medium Voltage Cable Replacement
Results
Less than $230,000 est. value
Ogden, UT 84408

Electric Infrastructure for FORGE
Term Contract
Post-Bid
Salt Lake City, UT 84112

Replace Instrumentation at Three (3) Existing Sewer Metering Stations
Results
Moab, UT

Price Theater Exterior Sign, Marquee and Facade Renovation
Post-Bid
Price, UT 84501

UPS System Maintenance
Term Contract
Results
Kamas, UT 84036

Dimmer Rack Upgrade
Post-Bid
Sandy, UT 84070

Installation of Underground Electrical Circuit
Results
Less than $50,000 est. value
West Jordan, UT 84088

The Inn Between Electrical Upgrade
Renovation
Post-Bid
Salt Lake City, UT 84105

DFCM Construction-Pre-Qualified Electrical Contractors-UNG West Jordan Armory Generator
Results
Less than $350,000 est. value
West Jordan, UT 84084

On-Call Task Order General Electrical Construction Services
Term Contract
Post-Bid
Salt Lake City, UT 84114

DFCM Construction Pre-Qualified Electrical Contractors-UNG Spanish Fork Armory Generator
Results
Less than $350,000 est. value
Spanish Fork, UT 84660

General Contractor and Electrical Contractor Timpanogos
Addition
Post-Bid
American Fork, UT

Reported 12/16/2021 12:00 AM
Project Title

Electrical Preventative Maintenance (EPM) Phase II

Physical Address View project details and contacts
City, State (County) Hill AFB, Hill Air Force Base, UT   (Davis County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The SESB and circuit breakers were inspected and tested to the ANSI/NETA MTS 2019. Due to a redesign of the service entrance equipment for bldg. 505, the 4000A main disconnect in the 505 SESB is no longer the main disconnecting means. New SESB equipment has been installed on the exterior of the building and upstream of the former SESB during the EPM, Phase 1. As part of the scope for Phase 1, the obsolete, 4000A circuit breaker was retro filled with a non-automatic 4000A circuit breaker. Deliverable reports have been generated which document the inspection and testing results of Phase 1

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents