Similar Projects
(3.26-Mile) Resurfacing HMA Pavement and Shoulders, Restriping Pavement Marking Lines, Making Existing Curb Ramps ADA Compliant, and Described herein along IL-47, from Burlington Rd to IL-64 (North Ave)
Infrastructure
Bidding
Campton Hills, Lily Lake, IL

Kaneland Paving Improvements 2022
Infrastructure
Bidding
Elburn, Maple Park, Sugar Grove, IL 60119

Edgelawn Bikeway Project Phase 3 Construction Engineering Services
Renovation
Post-Bid
Less than $408,000 est. value
Aurora, IL 60505

Central Division - Asphalt Paving Maintenance
Post-Bid

Pavement Improvements
Renovation
Results
Sugar Grove, IL 60554

Pavement Improvements
Renovation
Results
Sugar Grove, IL 60554

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

VNA Health Care Parking Area
Alteration
Construction
Aurora, IL 60506

Fay`s Lane and Whispering Oaks Lane Water Main and Roadway Improvements
Infrastructure
Bidding
Sugar Grove, IL

Site Paving
Post-Bid
Elgin, IL 60120

Traffic Signal Modernization and ADA Curb Ramp Improvements
Results
Elgin, IL

2022 Sugar Grove Township Resurfacing
Infrastructure
Bidding
Sugar Grove, IL 60554

Asphalt
Term Contract
Post-Bid
Saint Charles, IL

Smart Overlay, ADA Improvements and Milled Rumble Strips
Results
Aurora, IL 60502

2022 Rutland Township Resurfacing
Infrastructure
Bidding
Huntley, IL 60142

Last Updated 03/02/2022 03:45 PM
Project Title

Civic Center Parking and Streetscape Improvements

Physical Address View project details and contacts
City, State (County) South Elgin, IL   (Kane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which proposals are invited consists of constructing a new public parking lot and reconstructing the police parking lot west of the Civic Center and constructing streetscape improvements adjacent to the proposed parking lots within the right-of-way. Work for the parking lot includes concrete and asphalt pavement removal; earth excavation; grading and preparing sub-base material; placing aggregate base material; constructing storm sewer improvements; concrete curb and gutter; concrete sidewalk replacement and streetscape improvements; hotmix asphalt pavement; lighting improvements; pavement markings; and all incidental and collateral work necessary to complete the proposed improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents