Similar Projects
Public Library
New Construction - 36,800 SF
Conception
$16,900,000 est. value
Southington, CT

Renovation and Expansion of Whiton Branch Library - Town of Manchester
Addition
Conception
$2,687,640 est. value
Manchester, CT 06042

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

RFQ Engineering - Drinking Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
New Britain, CT 06051

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

The Spark - 690 Cedar Street Apartments
New Construction, Infrastructure - 364,669 SF
Post-Bid
$55,000,000 CJ est. value
Newington, CT 06111

Renovations and Improvements at Casey Field and E.G. Stocks Playground
Infrastructure
Results
$516,500 CJ est. value
Bristol, CT 06010

Owners Project Management Services
New Construction
Results
$150,000 est. value
Bloomfield, CT

O'Reilly Auto Parts (ENF) #6484 / Enfield
New Construction, Infrastructure - 7,250 SF
Construction
$1,900,000 CJ est. value
Enfield, CT 06082

The Byline Luxury Apartments
Term Contract, New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
West Hartford, CT 06107

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Renovation Of Mary Cheney Library - Town Of Manchester
Renovation
Conception
$4,000,000 est. value
Manchester, CT 06040

2610 Main Street Multi Family Townhome Buildings / Glastonbury
New Construction, Infrastructure
Design
$3,500,000 CJ est. value
Glastonbury, CT 06033

Last Updated 04/17/2023 01:07 PM
Project Title

Bloomfield Public Library Facilities - Town of Bloomfield

Physical Address View project details and contacts
City, State (County) Bloomfield, CT 06002   (Hartford County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Library - Public, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Design Development, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $23,400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 17, 2023, construction has not started. Construction will probably start in July 2023. *The closed solicitation has been included below for reference: TOWN OF BLOOMFIELD REQUEST FOR PROPOSALS #1107 CONSTRUCTION MANAGEMENT SERVICES FOR BLOOMFIELD PUBLIC LIBRARY FACILITIES The Town of Bloomfield is soliciting proposals from qualified Construction Managers at Risk for the purpose of construction management services for a new Prosser Library and addition and renovation of McMahon Wintonbury Library. All Construction Manager firms submitting proposals must be pre-qualified as a Construction Manager at Risk (Group B) as defined in the CT DAS Contractor Classification List. Submittal requirements may be found on the Town's website, www.bloomfieldct.gov. All responses must be received by 1:00 PM on September 10, 2021 to be considered. Approval of funding in the amount of $29,255,000 for this project is scheduled for referendum in November 2021. Estimated construction budget is approximately $23.4 million. The goal of the Town is to a) demolish the existing 20,200 sq. ft. Prosser Library, and replacing it with a new facility of approximately 28,000 SF on the same parcel, housing the same occupants, plus new parking on the adjoining (former lumber yard) property with a connecting bridge/walkway over Wash Brook, and b) renovate the existing 6,023 sq.ft. P. Faith McMahon Wintonbury Library along with a new addition of approximately 2,895 sq. ft. Schematic Design Phase 11/5/21-3/1/22 Design Development Phase 3/1/22-6/1/22 Construction Documents Phase 6/1/22-9/15/22 Bidding Phase 9/15/22-10/31/22 Construction 11/1/22-4/30/24 Construction Manager Services will commence after the November 2021 referendum subject to its approval. The selected Construction Manager shall provide performance and payment bond letter from the surety in the amount of 100% of the contract price.

Details

28,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents