Similar Projects
MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

McWhorter Center - Gymnastics and Softball Team Area Renovations
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Auburn Univ, AL 36849

Plainsman Park First Base Club, Green Monster Terrace & Right Field Terrace Improvements
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Auburn Univ, AL 36849

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lee Road 296 Paving Improvements
Infrastructure
Post-Bid
Smiths Station, AL 36877

Northpark Drive Improvements
Infrastructure
Results
$1,563,629 est. value
Opelika, AL 36801

FY21 Community Development Block Grant Resurfacing Project
Infrastructure
Results
$279,389 est. value
Auburn, AL

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

RV Roadway of Opelika Service Building
New Construction, Infrastructure - 11,250 SF
Conception
$3,000,000 CJ est. value
Opelika, AL 36801

Last Updated 02/06/2023 06:07 PM
Project Title

Roadway Improvements (Widening, Resurfacing, Culvert Extension, Center Turn Lane Installation, and Traffic Stripe) on SR-147 (Shug Jordan Parkway)

Physical Address View project details and contacts
City, State (County) Auburn, AL 36832   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $976,922 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Lee Constructing the Roadway Improvements (Widening, Resurfacing, Culvert Extension, Center Turn Lane Installation, and Traffic Stripe) on SR-147 (Shug Jordan Parkway) from north of the junction of Richland Road to the junction of the entrance to the National Guard Armory in Auburn. Length 0.431 mi. The Bracket Estimate on this project is from $963,542 to $1,177,662 . Contract Time: 30 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 077 - Roadway Improvements (Widening, Resurfacing, Culvert Extension, Center Turn Lane Installation, and Traffic Stripe) on SR-147 (Shug Jordan Parkway) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents