Similar Projects
Commercial Storage Facility
New Construction - 34,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Sister Bay, WI 54234

Multi-Tenant Commercial Building - Storage Units
New Construction - 46,080 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Caledonia, WI

East Madison Service Center Renovation -MEP
Renovation
Bidding
$860,000 est. value
Madison, WI 53704

East Madison Service Center Renovation - GPC
Renovation
Bidding
$860,000 est. value
Madison, WI 53704

Cold Storage Shed
New Construction
Post-Bid
Richland Center, WI 53581

Sheriff's Office Storage Building
New Construction
Post-Bid
Lake Mills, WI 53551

Pole Barn Insulation
Results
Pewaukee, WI 53072

2020 Sludge Storage Building
Results
Wisconsin Rapids, WI 54495

Thiele Heating & Air Conditioning
New Construction - 4,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Viking Electric Proposed Building
New Construction - 6,250 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Wausau, WI 54401

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Redevelopment Construction Of A Climate Controlled Self-Storage Facility
New Construction - 43,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Brookfield, WI 53005

2021 Phase 1 Improvements - St. Croix County Government Center
New Construction
Bidding
Hudson, WI 54016

Pre-Engineered Metal Buildings
New Construction
Post-Bid
New Berlin, WI 53151

Reported 10/16/2021 12:00 AM
Project Title

Replace Hazmat Building

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor must provide all labor, material, equipment, supervision, and transportation to furnish and install a new, steel, prefabricated HAZMAT storage building for storage of hazardous materials at Madison Air Traffic Control Tower (ATCT) in Madison, WI in accordance with the specifications and drawings.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents