Similar Projects
Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Bidding
Framingham, MA 01701

Comins Pond Wells Water Treatment Plant
Bidding
Warren, MA

Redevelopment of Municipal Drinking Water Supply Wells
Post-Bid
Less than $20,000 est. value
North Reading, MA

Narrows Road Facility Hydrogenerator and Marshall Regulating Plant Pumps - General Bid
Post-Bid
Fitchburg, MA 01420

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Rehabilitation of Springvale Well No. 2
Results
$22,299 est. value
Natick, MA

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Bidding
Belmont, MA

2020 Cleaning and Redeveloping of Kane and Chestnut Well 2
Post-Bid
Hudson, MA 01749

Construction and Testing of Pleasant Valley Well No. 2
Results
Less than $100,000 est. value
West Boylston, MA 01583

Disconnection and Relocation of Sump Pumps
Bidding
$1,360,000 est. value
Belmont, MA

2020 Cleaning and Redeveloping of Kane and Chestnut Well 2 Services
Post-Bid
Hudson, MA 01749

One Complete Sewage Ejector System
Results
Stoneham, MA

Well No. 5 Replacement Well Construction
Post-Bid
Less than $150,000 est. value
Dracut, MA 01826

Springvale WTP High Lift Pump Replacement
Results
$20,000 est. value
Natick, MA 01760

Well No. 3 Upgrades - General Bids
Post-Bid
Less than $750,000 est. value
Littleton, MA

Last Updated 03/23/2021 02:45 PM
Project Title

Replace Sewer Macerators

Physical Address View project details and contacts
City, State (County) Ayer, Devens, MA 01434 (Middlesex, Worcester Counties)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing macerators and installation flanges will be removed from service and replaced with new Muffin Monster brand sewage grinders. The replacement macerators will be new units, not re-conditioned or rebuilt items. Included in this contract will be the supply of a single, brand-new macerator as a backup unit. This unit will be prepared for storage and used in the case of a failure of one of the installed units. Any work required beyond the flanges of the existing macerators will be part of a separate contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents