Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Racetrack Water Tower Booster Pump Station
New Construction
Bidding
$750,000 est. value
Homestead, FL 33035

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Continuing Contracts for Construction Manager at-Risk Services
Post-Bid
Plant City, FL

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Water Booster Station #1
Results
Gretna, FL

Tierra Verde Lift Station
New Construction
Construction
Tierra Verde, FL 33715

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Wastewater Pump Station Improvements
Design
North Bay Village, FL

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Repair and Rehabilitation of Sanitary Sewer Manholes and Lift Stations
Results
Less than $500,000 est. value
Cape Coral, FL 33915

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Design
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Last Updated 04/22/2022 07:36 AM
Project Title

Lift Station Rehab 6 and 21

Physical Address View project details and contacts
City, State (County) Lynn Haven, FL 32444   (Bay County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lift Station # 6,1900 Minnesota Ave: Remove old piping and install 4” stainless steel piping in the wet well. Install spray coated liner on interior of wet well. Demo and remove existing valve vault. Remove old piping and install 4” epoxy lined Ductile Iron outside the wet well. Remove electrical control and install new CSI control panel. Remove old 7.5 HP pumps and install new 10 HP Flygt pumps. Remove old and install new base elbows. Remove old and install new 2” guide rails. Remove old and install new check valves. Remove old and install new cut off valves. Remove old and install new 4” by-pass connections. Install new ¼” turn valve and pressure gauge installed after the check valves. Install bollards or fencing to protect above ground valves and piping. Lift Station # 21, 1002 Shetland Ct.: Remove old piping and install 4” stainless steel piping in the wet well. Remove old piping and install 4” epoxy lined Ductile Iron outside the wet well. Remove old and install new base elbows. Remove old and install new 2” guide rails. Remove old and install new check valves. Remove old and install new cut off valves. Remove old and install new 4” by-pass connections. Install new ¼” turn valve and pressure gauge installed after the check valves

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents