Similar Projects
Whiteboard Removal, Wall Restoration and Painting Services
Alteration
Bidding
Prospect Heights, IL

Main Library Interior/Exterior Painting
Post-Bid
Evanston, IL 60201

Aquatic Centers Painting
Post-Bid
Chicago, IL 60646

Bridge Painting
Results
Calumet City, Thornton, IL 60409

Cleaning and Painting Steel Structure
Results
Palos Heights, Worth, IL 60482

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

Oakton Street Water Tank Painting
Post-Bid
Des Plaines, IL 60018

Cleaning and Painting Designated Existing Steel
Results
Glencoe, IL

Streamwood High School Paint Removal Using Chemical Stripper
Post-Bid
Streamwood, IL 60107

Streamwood High School Painting Project Phase Three
Results
Streamwood, IL

Cleaning and Painting Existing Steel Structures at 2 Locations
Post-Bid
Burnham, Tinley Park, IL

Mission Brook Sanitary District - Ground Storage Tank Repainting
Results
Northbrook, IL 60062

1.5 Mg Elevated Water Storage Tank Repainting
Post-Bid
La Grange, IL

Village of Western Springs - Elevated Water Storage Tank Maintenance and Repainting
Results
Western Springs, IL

2021 Street Light Pole Painting Program
Post-Bid
IL

Reported 03/03/2022 12:00 AM
Project Title

Fire Hydrant Painting Program

Physical Address View project details and contacts
City, State (County) Orland Park, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this scope includes furnishing of all labor, material, transportation, tools, and supplies necessary to sandblast, prime, and paint approximately twenty-five hundred (2,500) hydrants on the Village’s water system in FY2022 through FY2024, with a two (2) year option to extend contract. The objective of this scope is to provide the details of the expected material and workmanship necessary to produce a quality coating system. All painting work shall be implemented in accordance with the manufacturer’s instruction, and shall be performed in a manner satisfactory with the Village.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents