Similar Projects
29 Wastewater Line Construction
Infrastructure
Bidding
$18,478,030 CJ est. value
San Antonio, TX 78205

Harmony School of Innovation - Sugar Land - Water Interconnect
Infrastructure
Bidding
$375,000 CJ est. value
Sugar Land, TX 77498

Water Well No. 2 Rehabilitation
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Sugar Land, TX 77498

Purchase of Lift Station 20 Pumps
Term Contract
Sub-Bidding
Port Isabel, TX 78578

Matagorda Ship Channel, Texas, Matagorda Peninsula to Point Comfort, Pipeline Dredging
Term Contract
Post-Bid
$50,000,000 CJ est. value
Galveston, TX 77553

Phillips Event Center Plumbing
Alteration
Post-Bid
Bryan, TX 77802

Plumbing System Maintenance and Related Services
Term Contract
Results
Los Fresnos, TX

Plumbing Services and Materials
Alteration
Results
$300,000 est. value
El Paso, TX

Beeline Drive Sewer Line Replacement
Infrastructure
Construction
$546,469 CJ est. value
Harker Heights, TX 76548

Trinity Ranch Phase 1 Section 3 Paving, Drainage, Water & Wastewater Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Flatonia, TX 78941

Plumbing Services
Term Contract
Post-Bid
Dallas, TX

Fox Fine Arts Center - Piping Replacement Project
Alteration
Results
El Paso, TX 79902

Plumbing Maintenance and Repair Services
Alteration
Post-Bid
Odessa, TX

Plumbing Services District-Wide
Term Contract
Results
Brownsville, TX

Telford Unit - Replace Hot Water and Steam Piping
Alteration
Post-Bid
New Boston, TX 75570

Last Updated 03/31/2023 02:38 AM
Project Title

Richardson 825 PZ - Package 7 - Meter Vault, Richardson 2 Delivery Site

Physical Address View project details and contacts
City, State (County) Princeton, TX 75407   (Collin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $6,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of Water Improvements to Expand the 825 Pressure Zone Capacity of the City's Water Distribution System includes the Northside II Pump Station Expansion, Ground Storage Tank, City of Richardson Water Line, NTMWD Metering Station and Water Transmission Line. The expansion to 15 MGD has been commissioned to provide increased potable water needs associated with new development and growing demands. A new 5 MG Ground Storage Tank will be constructed adjacent to the Existing Northside Facility. Approximately 6,500 linear feet (LF) 30-inch, 2,100 LF of 20-inch, and 2,100 LF of 12-inch waterline along Renner Road, generally from Northside Pump Station (Pump Station) to Alma Road and along Alma Road from Renner Road to just south of President George Bush Turnpike (PGBT). The purpose of the water line is to facilitate moving the service area north of Renner Road and west of Alma Road (Service Area) from the 767 East Pressure Zone (767 EPZ) to the 825 Pressure Zone (825 PZ) and includes the following: Connection to 825PZ at the Pump Station. Multiple connections to the Service Area with the new pipeline as identified by the City. Maintain connectivity between 767 EPZ and 825 PZ. Maintain operation of the existing Booter Station west of Custer Road. A new North Texas Municipal Water District Metering Station and Water Transmission Line will be installed at the NSPS Site and along Renner Road from the NSPS to Custer Road to provide additional capacity to COR water system. The deadline to ask questions is 3/15/2023 3:00 PM CST All questions about the meaning or intent of the Contract Documents shall be received inwriting via CivCast

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents