Reported | 07/31/2021 12:00 AM |
Project Title | 59--UAS Fiber Optic Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Fort Campbell, KY (Christian County) |
Category(s) | Single Trades |
Sub-Category(s) | Security/Communications |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | FOB Destination shall be Fort Campbell, KY 42223 The MICC End User requires the following items, Brand Name or Equal, to the following: LI 001: Furnish and install three (3), Single Jacket, Single Armored, 24-strand 50-micron OM-4 rated optical fiber cable for Unmanned Aircraft System (UAS) connectivity to Satellite Ground Data Terminal (SGDT) and the Ground Control Stations (GCS) (approx. 4900 ft.) Pad sites from the UAV Hangar., 1, EA; LI 002: Deployable Interface in UAV Hangar to PAD sites (Cables 1 & 2). The installation of the optical fiber cable will provide a direct connection, permanent link, from a central location in the Unmanned Aerial Vehicle Hangar Bay to the SGDT and GCS pads utilizing laser optimized multi-mode allowing for the connectivity of the new OCC COTS 83526 Connectors., 1, EA; LI 003: Field Side installation on the Pad sites will require the installation of additional NEMA rated enclosures to serve as the terminal interface panel for the new bulkhead connectors, to be mounted to the existing field cabinet., 1, EA; LI 004: Each NEMA rated enclosure will include OCC COTS 83526 Bulkhead connectors mounted to the exterior of the NEMA Enclosure, as the field connection point., 1, EA; LI 005: Install a wall mounted secure enclosure with OCC COTS 83526 Bulkhead connectors in the UAV Hangar., 1, EA; LI 006: Each of the installed enclosures will terminate the newly installed fiber optic cable on the industry standard fiber optic patch panels using LC patch panels, 1, EA; LI 007: Terminate the tails of the OCC COTS 83526 with LC connectors and plug the terminated tails into the designated fiber strands., 1, EA; LI 008: Test the completed installation and provide documented test results., 1, EA; LI 009: GBSSA to GCS Pad (cable 3) - Furnish and install a Single Jacket, Single Armored, 12-strand 50-micron OM-4 rated optical fiber cable from the GBSSA to the GCS Pad., 1, EA; LI 010: Terminate the fiber in the GBSSA in the 1RU rack mounted enclosure, utilizing LC Connectors and Panels, 1, EA; LI 011: Terminate the fiber on the GCS Pad site utilizing the NEMA rated enclosure provided., 1, EA; LI 012: The contract requirements must meet the below standards for each of the specified connections. REA to LEA: -15 dB to -11 dB LEA to REA: -15 dB to -11 dB REA to GCS: -20 dB to -14 dB GCS to REA: -17 dB to -11 dB LEA to GCS: -13 dB to -6.5 dB GCS to LEA: -17 dB to -11.5 dB, 1, EA; LI 013: 24 F, 50um multimode (OM4) Corning (012TU-T4790D20), 15000, FT; LI 014: Holds 2 CCH Connector Panels Corning (WCH-02P), 1, EA; LI 015: 12 F, 25-in legs Corning (FAN-OD25-12), 6, EA; LI 016: 12 F, LC duplex, aqua, 50 um multimode (OM4) Corning (CCH-CS12-E4-P00QE), 3, EA; LI 017: Heat-Shrink Fusion Splice Protector Parts, single-fiber, 40 mm long Corning (2806032-01), 1, EA; LI 018: NEMA enclosure Hoffman (A242412LP), 2, EA; LI 019: Enclosure Backplate Hoffman (A24P24), 2, EA; LI 020: Secure Vertical 5U Wall Mount Rack Hubbell (RE4B), 1, EA; LI 021: OCC Bulkhead Connectros-MIL SPEC 4-channel OCC (OCC COT 83526), 15, EA; LI 022: 12 F, 50um multimode (OM4) Corning (012TU-T4790D20), 1000, FT; LI 023: Fiber connectors OM4 Field Install - Corning (95-051-98-SPX), 48, EA; LI 024: Single Panel Housing - Corning (SPH-01P), 4, EA; LI 025: Housing (CCH) Panel, LC, Duplex, 12 fiber, 50 um multimode (OM3/4) Corning (CCH-CP12-E4), 3, EA; LI 026: GCS’s - Hangar Comms Closet GBSAA Connection 100’, 2, EA; LI 027: Hangar Comms Closet to Main Comms Closet- 430’, 2, EA; LI 028: 2nd Floor Comms Closet to GBSAA Office- 52’, 2, EA; LI 029: GCS to USGDT 3610’, 1, EA; LI 030: GCS to UGDT 4730’, 1, EA; |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |