Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

I-75 MLK DDI
Bidding
FL

Brentwood Park, Installation of ADA Compliant Concrete Path
Bidding
Jacksonville, FL 32206

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

Brewster Park - Parking and Overlook Improvements
Results
Less than $101,300 est. value
Deltona, FL 32738

Gate Parkway Traffic Calming Project
Bidding
Jacksonville, FL

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Simonton Street Improvements
Results
Less than $2,052,336 est. value
Key West, FL 33040

Infrastructure Construction and Maintenance
Term Contract
Bidding
Less than $30,000,000 est. value
Stuart, FL

Charlotte County Public Schools Punta Gorda Airport Phase 3A Parking
Post-Bid
Punta Gorda, FL

4th Avenue Sidewalk - JSEB Set-Aside
Results
Jacksonville, FL 32202

Concrete Curbing, Driveways, Sidewalks, Annual Contract
Term Contract
Bidding
Milton, FL

VCA Improvements to Common Areas & Parking Spaces
Post-Bid
Hialeah, FL 33014

Last Updated 05/03/2021 07:54 AM
Project Title

Placid Lakes Sidewalk Improvements ADA Transition Plan

Physical Address View project details and contacts
City, State (County) FL   (Highlands County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide all labor, materials and equipment to construct the Placid Lakes Sidewalk Improvements ADA Transition Plan project in accordance with the plans and specifications. The work consists of, but not limited to, the removal of existing concrete sidewalk, adding new concrete sidewalk, installation of detectable warning surfaces, milling and resurfacing of existing side road approaches, striping, and installation of sod within the rights-of-way of Placid Lakes Boulevard as depicted in Exhibit A. Maintenance of traffic will be the responsibility of the Contractor. The Contractor shall have seventy-five (75) calendar days to complete the Project after the issuance of the Notice to Proceed to run.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents