Similar Projects
H12 New High School
New Construction
Design
Less than $152,291,274 est. value
Apex, NC 27539

Combo RTP M-19/H-11 Middle and High School
New Construction
Design
$128,149,254 est. value
Morrisville, NC 27560

Fuquay Varina Middle School - Group 2A
New Construction - 242,665 SF
Bidding
$20,000,000 est. value
Fuquay-Varina, NC 27526

Fuquay Varina Middle School - Group 2B (BP 07B - BP 26A)
Renovation - 242,665 SF
Bidding
$20,000,000 est. value
Fuquay-Varina, NC 27526

M15 Fuquay-Varina Middle School
Renovation - 242,665 SF
Sub-Bidding
$40,000,000 est. value
Fuquay-Varina, NC

Two Elementary School Renovation/Replacements, One New Elementary School, One New Middle School with High School Component, and One 6-12 Alternative Learning Program School
Renovation
Post-Bid
Cary, NC 27519

Seeding and Fertilizing
Term Contract
Post-Bid
Raleigh, NC

General Construction and Repair - Central Region
Results
Raleigh, NC

General Construction and Repair - East Region
Term Contract
Results
Raleigh, NC

Herbert Akins Road Middle School(M-14)
New Construction - 170,000 SF
Construction
Fuquay-Varina, NC 27526

West Millbrook Middle School Project
New Construction - 250,000 SF
Construction
Raleigh, NC 27615

Neuse River Middle School Bathroom Facility Project
New Construction
Post-Bid
Neuse, NC 27604

General Construction and Repair - North Region
Renovation, Term Contract
Results
Raleigh, NC

Elevator Installation and Repair Service
Term Contract
Post-Bid
NC

General Construction and Repair - South Region
Renovation, Term Contract
Results
Raleigh, NC

Last Updated 05/09/2022 06:38 AM
Project Title

Knightdale High School Central Plant Replacement

Physical Address View project details and contacts
City, State (County) Knightdale, NC 27545   (Wake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The removal/replacement of all existing major HVAC equipment in central plant (boilers, pumps, chillers, unit heaters) The electrical disconnection/reconnection or new connection to HVAC equipment to support the renovations. Connect new equipment to existing controls system.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents