Similar Projects
Last Updated | 12/19/2022 12:04 PM |
Project Title | Banks Lake Pumped Storage - Columbia Basin Hydropower |
Physical Address | View project details and contacts |
City, State (County) | Beverly, WA 99321 (Grant County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected June 2025 |
Bids Due | View project details and contacts |
Estimated Value | $1,400,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of December 19, 2022, this project is in the conceptual phase. An engineer has not been selected. A firm timeline for bidding and start of construction has not been determined. Proposed development of a hydroelectric pumped project rate up to 500 megawatts. The Banks Lake Pumped Storage Project would be located in central Washington State and utilize two existing reservoirs--Banks Lake and Lake Roosevelt--to provide a new source of carbon-free capacity and ancillary services to the Pacific Northwest power grid. The project would be located on the west side of Lake Roosevelt just upstream of Grand Coulee Dam and near the Bureau of Reclamation's existing Keys pump-generation plant. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |