Similar Projects
Transformer - Utilities and Energy
Post-Bid
Auburn, AL

Generator Maintenance
Term Contract
Post-Bid
Huntsville, AL 35801

Z--Replace/Upgrade Electrical Switchgear Phase 3
Results
$1,000,000 to $5,000,000 est. value
Birmingham, AL 35233

J--Electrical Voltage Testing
Results
Tuskegee, AL 36083

Lighting of Exit 46
Post-Bid
Less than $280,000 est. value
Carbon Hill, AL

One (1) 115 Kv Circuit Switchers at the Silverhill Substation
Results
Foley, AL

Freedom Manor Solar Project
Post-Bid
Birmingham, AL 35203

Theater Lighting
Results
Less than $19,616 est. value
Huntsville, AL

Lighting Improvements at the Capitol Complex
Post-Bid
$500,000 to $700,000 est. value
Montgomery, AL 36104

Electrical Improvements at The Champions Monument
Results
Gadsden, AL

Henry Peters Electric Service
Post-Bid
$200,000 to $225,000 est. value
Birmingham, AL

Sports Light Fixtures
Term Contract
Results
Mobile, AL 36618

LED Relamping
Post-Bid
Tuscaloosa, AL 35403

A New Emergency Generator for Utility Collections Office
Results
Dothan, AL 36303

Switchgears - Utilities and Energy
Post-Bid
Auburn, AL 368495101

Last Updated 04/16/2020 04:37 PM
Project Title

Switchgear at Jones Bluff Powerhouse

Physical Address View project details and contacts
City, State (County) Selma, AL 36701   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of: a. Remove existing 15KV generator switchgear lineups for units 1-2 and station service breaker no. 1, and for units 3-4 and station service breaker no. 2. b. Install two government furnished new 15KV generator switchgear lineups. One containing generator breakers for units 1 and 2 (breakers 710 & 720) and station service breaker no. 1 (breaker 812), and the second containing generator breakers for units 3 and 4 (breakers 730 & 740) and station service no. 2 (breaker 822). c. Replace all the cables from removed equipment and install new conductors to new equipment. d. Replace, as necessary, the existing non-segregated bus from the generators and GSU in order to connect to the new 15KV switchgear, to include all connectors and fasteners. e. Coordinate with the switchgear manufacturer to Design and Fabricate,as necessary, and Install balance of the plenum system for each of the new switchgear to vent the exhaust to a safe area. f. Replace the existing surge arrestors and capacitors in the new government furnished equipment with new surge arrestors and capacitors. g. Perform necessary commissioning and testing. h. Remove a section of the synchronous condensing pipe and re-install the pipe with flanges. i. Remove the switchgear room door and associated hardware and frame to facilitate installation of the switchgear. Contractor shall retain doors for re-use for an in-kind restoration of the entryways to original condition. The contractor shall be responsible for field verifying existing drawings and creating as-built drawings.

Details

Division 26 - Electrical, Medium-Voltage Switchgear, Low-Voltage Switchgear.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents