Similar Projects
Ham Wilson Arena - Facilities Management Training Facility Renovations
Renovation
Bidding
Auburn, AL 36849

Emergency Mitigation Recovery and Restoration Services
Renovation
Post-Bid
Auburn, AL 368495101

HAC Building - Elevator Upgrades and Renovations for Southern Union State Community College
Renovation
Post-Bid
Opelika, AL 36801

Miller Poultry Center - Poultry Relocation Project (Phases III-VI) - Bid Package 2
Results
Auburn, AL

New Maintenance Shop for Southern Union State Community College
New Construction
Results
Opelika, AL 36801

Rane Culinary Science Center - New Building
New Construction - 142,000 SF
Construction
Less than $110,000,000 est. value
Auburn, AL 36849

Academic Classroom & Laboratory Complex (ACLC) New Facility
New Construction - 496,000 SF
Construction
Less than $83,000,000 est. value
Auburn, AL 36830

Comer Hall - Comprehensive Renovation (Phase I)
Renovation
Post-Bid
Auburn, AL 36849

Student Center - Rooms 3101 and 3130, Renovations for Student Involvement
Renovation
Results
Auburn, AL

Advanced Structural Testing Laboratory - New Facility
New Construction
Construction
Less than $22,000,000 est. value
Auburn, AL

A New One-Stop Center for Southern Union State Community College Renovations to the Opelika Campus Administration Building
Renovation - 15,200 SF
Results
Opelika, AL 36801

Central Dining Facility New Building General Works Package
New Construction - 200,000 SF
Construction
Auburn, AL 36830

Leach Science Center - Butler Building Addition, New HVAC System and Fire Alarm System
Addition
Results
Auburn, AL 36849

Leach Science Center - Basement Level, Build-Out of Shell Space for COSAM
Construction
Auburn, AL 36849

Concrete Moist Cure Room
Addition
Results
Less than $61,375 est. value
Auburn, AL

Last Updated 11/25/2019 04:07 PM
Project Title

Miller Poultry Center - Poultry Farm Relocation Project (Phases III-VI)

Physical Address View project details and contacts
City, State (County) Auburn, AL   (Lee County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced, Construction Completion Expected March 2020
Bids Due View project details and contacts
Estimated Value $18,030,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents